Manufacturers pledge to work with Government on cladding crisis

Latest News Tue, Jan 25, 2022 8:12 AM

The Construction Products Association has said it is willing to continue working closely with the Government to find the right solutions for the cladding crisis.

It comes after Michael Gove MP, Secretary of State at the Department for Levelling Up, Housing and Communities, wrote to the CPA to “set out the contribution that cladding and insulation manufacturers will need to make to fixing the crisis” involving leaseholders and cladding remediation.

In the letter, the Secretary of State asks cladding and insulation manufacturers to agree to:

  • make financial contributions this year and in subsequent years to fund remediation of unsafe cladding on 11-18 metre buildings. This is alongside the financial contributions the Secretary of State has requested separately from the residential property developer industry to cover cost to remediate unsafe cladding on 11-18 metre buildings, currently estimated to be £4 billion.
  • provide comprehensive information on all buildings over 11m which have historic fire-safety defects to which these companies have supplied products or services.

In response, the CPA’s statement said: “This letter follows similar correspondence and meetings with representatives of the housebuilding sector, as well as statements the Minister made in the House of Commons.

“We have had the benefit of several meetings with the Minister’s Residents Voice and the Building Safety Levy team over the past weeks, that have helped them understand the complexity of the issues and market participants involved. That team has nonetheless made clear the Minister’s ambitions and has requested our cooperation in planning a meeting with him and some relevant construction product manufacturers to discuss the matter further.

“We have asked for a separate meeting to clarify the details behind the government’s proposals.

“With all this in mind we are happy to work with government and our members in the spirit of cooperation to address these issues.”

Featured News

Specification news
Hybrid tapes: future proof buildings and property

With their ability to expand and contract to guarantee seals that alternative wet...

Read More >>

Specification news
TRILUX Opens London Light Studio to Strengthen Customer...

Light. Space. Dialogue.TRILUX has opened a new Light Studio in Charterhouse Square,...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

2026 Product Brochure Brochure

2026 Product Brochur...
By ​The Radiator Compan...

Download Now >>

System for Laying Floor and Wall Coverings Brochure

System for Laying Fl...
By FassaFloor

Download Now >>

Training for Excellence Brochure

Training for Excelle...
By Aico

Download Now >>

The Connected Home Solution Brochure

The Connected Home S...
By Aico

Download Now >>

Safety First, Aico First Brochure

Safety First, Aico F...
By Aico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Glass Partition Walls
Glass Partition Walls

Partition wall systems made of glass allow transparent room partition. They open, divide and...

Read More >>

FASSAFILL MEDIUM
FASSAFILL MEDIUM

Water repellent cement-based sealant for grouting joints from 2 to 12 mm, resistant to mould and...

Read More >>

FASSA AQUAZIP FAST
FASSA AQUAZIP FAST

Two-component elastic cement membrane, quick drying even at low temperatures, for waterproofing and...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

DAB EsyBox Pop | Compact booster pump for perfect home water pressure
DAB EsyBox Pop | Compact booster pump for perfect home water pressure

Struggling with weak showers and inconsistent flow? The DAB EsyBox Pop is the revolutionary,...

Watch Now >>

Marsh Industries - Phos-Lite
Marsh Industries - Phos-Lite

Marsh Industries - Phos-Lite

Watch Now >>

Marsh Industries - Nutra-Lite
Marsh Industries - Nutra-Lite

Marsh Industries - Nutra-Lite

Watch Now >>