Latest News Thu, Sep 2, 2021 5:59 AM
Following the successful delivery by Balfour Beatty, Morgan Sindall Infrastructure and VINCI Construction (BBMV), Crossrail has handed over the Whitechapel Elizabeth Line station to Transport for London.
The new Whitechapel Elizabeth line station will see thousands of commuters pass through each day, providing quicker, easier and more convenient travel across London.
In addition, the joint venture successfully delivered the tunnelling works at both Whitechapel Elizabeth line and Liverpool Street stations; delving beneath the ground to excavate 60,000m³ of material.

Whitechapel Elizabeth line station is acknowledged as one of the most complex and challenging stations on the Crossrail project. The new station concourse was constructed on a bridge consisting of 2,800 tonnes of structural steelwork, above the existing station and two operational railway lines – the London Overground and London Underground.
Steve O’Sullivan, BBMV Project Director, said: “As I reflect on this incredible feat of engineering, I have never been more proud of what our incredible team have delivered. It truly is testament to the collaborative culture of our joint venture, who have persevered throughout the challenges faced by the global COVID-19 pandemic.
“We now look forward to watching as the station plays a role in transforming travel across London, whilst also supporting wider regeneration in the local area through job creation and opportunities for local businesses.”
Mark Wild, Crossrail Chief Executive, said: "The whole team at Whitechapel have done a fantastic job weaving between the existing operational transport services to create this incredible new Elizabeth line station which has been one of the most challenging Elizabeth line stations to construct. I am delighted this station has now been handed over to London Underground and I am sure customers will be very impressed when they start using the new station entrance."
Passengers will access the new station through the sensitively restored original entrance on Whitechapel High Street, opened in 1876. The new station has nine lifts and three escalators and will, for the first time, provide step-free access to improve accessibility for those visiting the renowned Royal London Hospital and the surrounding area.
Featured News
Following some recent modifications, Myson has announced that its fan convectors are...
Acquisition of major independent businesses completed Holcim UK has acquired a group...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
ACO Blue Roof Guide...
By ACO Building Drainag...
Stannah Commercial B...
By Stannah Group
Levelmaster
By Stannah Group
Trolleylift
By Stannah Group
Stannah Midilift CLS
By Stannah Group
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
The Supreme heavy-duty loft ladder is supplied as a ready to fit unit. It is manufactured from high...
Insulated and Airtight wooden loft ladder……sets the standard for long-lasting quality and...
The Elite heavy-duty loft ladder...The Elite heavy duty concertina loft ladder is supplied without a...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Proctor Air® is an air and vapour permeable, highly water resistant roofing underlay. Its...
In this video, we explore how blue roofs are transforming urban landscapes by helping to mitigate...
At RMD Profiles, we’re more than just metal decking. From supply-only solutions to full design and...