WILO PUMPS ‘DRIVE’ NEW LANDMARK BUILDING FOR COVENTRY

Latest News Fri, Nov 22, 2019 2:27 PM

The area around Coventry mainline train station is undergoing an impressive transformation as regeneration comes back to Coventry. And Wilo UK has had a major role to play in the stand-out building in the new development providing all the pumps for the new home of Coventry City Council.

Designed by international architecture and urban planning practice Allies and Morrison, the Friargate Masterplan brings to Coventry a world-class commercial district that provides opportunities for work, living, visiting and staying. Situated within a 37-acre site linking Coventry Railway Station with the city’s retail core, Friargate if the most strategically significant mixed use scheme seen in Coventry for a generation.

Comprising 3,200,000 sq ft of mixed-use development, once completed, Friargate will deliver a total of 25 efficient and sustainable buildings, including Grade A office buildings, shops, restaurants, two hotels and new homes, high quality landscaped public spaces and the create 15,000 new jobs.

The stand-out building in the new development is No1 Friargate, which features grade A offices and public spaces, and is the new headquarters for Coventry City Council. This impressive new multi-storey office building has been handed over to its new owners. The main contractor on the scheme was Bowmer & Kirkland and Derry Building Services was responsible for the M&E works in their entirety, both design and build.

No1 Friargate was the first building in the Friargate masterplan to be constructed. Coventry City Council has occupied nine floors and the Financial Ombudsman Service is occupying the remaining two. The building offers some of the region’s most modern office space.

It is mostly open plan with huddle stations and acoustic booths. The Council and Financial Ombudsman Service will share the swish ground floor and first floor office space, benefiting from the conference room coffee shop facilities.

The stunning red-brick façade has been designed to reflect the traditional materials used in some of Coventry’s finest buildings, including Coventry Cathedral, with the building already a prominent part of the city’s skyline.

The project featured a wide range of Wilo pumps providing primary and secondary heating, chilled water and Cooling water pumps as well as a domestic cold water booster set.

“Thishas been a major project for us and its extremely rewarding to see a plant room that is so impressive at the base of this impressive new building,” says Wilo’s Gary Wheatley. “It’s a perfect case study for us, highlighting so many of the pumps we produce working closely

together in a single plant room, in a major project like this one.”

Featured News

Specification news
New trade measures to support steel sector

Steel producers across the UK will benefit from stronger trade measures from 1 July,...

Read More >>

Specification news
INSTANTOR INTRODUCES R-PRESS – A NEW RANGE OF PRESS...

Providing a safer, faster way to join pipework, Instantor has developed brand new...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

HPS200 Ultra Case Study Brochure Brochure

HPS200 Ultra Case St...
By Tata Steel

Download Now >>

Confidex Datasheet Brochure

Confidex Datasheet
By Tata Steel

Download Now >>

Prisma UK 2024 Brochure

Prisma UK 2024
By Tata Steel

Download Now >>

HPS200 Ultra UK Brochure

HPS200 Ultra UK
By Tata Steel

Download Now >>

Amtico Bio Support Document  Brochure

Amtico Bio Support D...
By Amtico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

​The Confidex® Guarantee
​The Confidex® Guarantee

Offers the most comprehensive guarantee for pre-finished steel products in Europe and provides peace...

Read More >>

Colorcoat HPS200 Ultra®
Colorcoat HPS200 Ultra®

Colorcoat HPS200 Ultra®Super durable guaranteed performance.Designed to withstand even the most...

Read More >>

Prisma
Prisma

Colorcoat Prisma®Aesthetics that last, guaranteed.Colorcoat Prisma® demonstrates a step change by...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>