Rapid renovation at flood damaged school.

Latest News Fri, May 31, 2019 11:20 AM


A UZIN system was used to install a new floor at St Bede's School in Cambridge after the dining room was damaged by a leaking pipe over the weekend. The flooring contractor, Superior Finish Contracts Ltd was asked at short notice to remove the existing wood block flooring and install the new luxury vinyl tiles. This was especially challenging as the project had to be completed during the half term break and made available for use for when the children returned. Superior Finish Contracts Ltd therefore turned to an UZIN system to ensure the project was completed during the school holiday.

Superior Finish Contracts Ltd first had to remove and dispose of approximately 6,500 wood blocks. To compensate for the wood block removal UZIN Deep Fill was used to raise the level of the substrate back up to a suitable height. UZIN NC 163 smoothing compound was then used to create a flat and smooth subfloor. The Karndean Da Vinci luxury vinyl tiles were then installed. The refurbishment went very well and was completed in plenty of time before the children returned to School.

www.superiorfinishcontracts.co.uk

www.uzin.co.uk

Call: 01788 530 080

Featured News

Specification news
What is a Spandrel Panel?

Spanning safety and style is the principle at the heart of our innovative ...

Read More >>

Specification news
The Speedpanel Story

Our Speedpanel A2® insulated spandrel panels are the result of years of ...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Showering & Bathing Product Catalogue 2022 Brochure

Showering & Bathing...
By AKW

Download Now >>

Livenza Plus Brochure

Livenza Plus
By AKW

Download Now >>

Sanitaryware Solutions Brochure

Sanitaryware Solutio...
By AKW

Download Now >>

Mullen® | Level-Access Showering Brochure

Mullen® | Level-Acce...
By AKW

Download Now >>

BEAUTIFUL SHOWERING Brochure

BEAUTIFUL SHOWERING
By AKW

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Thermo-loc FR60 60 Minute Fire-Rated Cavity Closer
Thermo-loc FR60 60 Minute Fire-Rated Cavity Closer

60-minute fire-rated cavity closer for eliminating damp and cold bridging around doors, windows, and...

Read More >>

Thermo-loc FR30 30 Minute Fire-Rated Cavity Closer
Thermo-loc FR30 30 Minute Fire-Rated Cavity Closer

30-minute fire-rated cavity closer for eliminating damp and cold bridging around doors, windows, and...

Read More >>

Thermo-loc Platinum Multi Cavity Closer
Thermo-loc Platinum Multi Cavity Closer

Cavity closers designed to eliminate damp and cold bridging around doors, windows, and sills. ...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Introducing Livenza Plus
Introducing Livenza Plus

The new sanitaryware range from AKW

Watch Now >>

Rise & Fall Bidet
Rise & Fall Bidet

Kate Sheehan takes us through the new AKW rise and fall bidet range from an occupational therapist's...

Watch Now >>