ULTRA3 drainage for Inverurie Community Campus reduces project costs

Latest News Wed, Feb 27, 2019 4:23 PM


Contractors for a new £55 million community campus in Inverurie have saved 20% on drainage, thanks to JDPs extensive range of products in their local Inverurie branch.

The 20% cost saving was the result of JDP’s product innovation and local stock availability, supplying one of the biggest school construction projects in Scotland with drainage solutions.

Providing space for 1,600 pupils, the Inverurie Community Campus will feature indoor pitches, a health centre and a range of amenities for the local community. Due to open in 2020, the campus will also accommodate St Andrews Special School, providing education and support for children with a range of barriers to learning.

JDP was able to provide a complete range of underground drainage systems to David Smith Contractors for this project. Caroline Lee, Regional Sales Office Supervisor at JDP explains: “JDP focuses on providing exceptional service and specialist support to the industry, and for this project, it was no different.”

ULTRA3 was a key component in the underground sewer drainage system, thanks to its full combination of fittings. The lightweight pipes, which are made from recycled materials, were complemented by David Smith contractors. “ULTRA3 saves money throughout the project compared to equal alternatives. David Smith contractors have two drainage squads and had both separately contacted the contracts manager to say how easy it was to install and comment on how robust it was”, said Caroline.

For projects focused on sustainability, ULTRA3 is a natural choice as it reduces CO2 emissions by being lightweight and able to store more during delivery. JDP’s hyper-local availability aided more savings for the Inverurie project, having product readily available every step of the way.


https://www.jdpipes.co.uk/

Featured News

Specification news
Consultation launched for housing stock condition...

The Royal Institution of Chartered Surveyors (RICS) has launched a consultation for a...

Read More >>

Specification news
Prison building boom with the biggest jail expansion...

Around 5,000 new prison places are under construction – including in the North...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

ACO Blue Roof Guide – Vol 2 Brochure

ACO Blue Roof Guide...
By ACO Building Drainag...

Download Now >>

Stannah Commercial Brochure Brochure

Stannah Commercial B...
By Stannah Group

Download Now >>

Stannah Midilift CLS Brochure

Stannah Midilift CLS
By Stannah Group

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Roofing Collections
Roofing Collections

Our carefully curated range of handmade roofing tiles and slates is specifically designed to...

Read More >>

Special Brick Collections
Special Brick Collections

Special-shaped bricks are specifically designed to feature a variety of shapes and dimensions that...

Read More >>

Brick Slips
Brick Slips

Brick slips manufactured from genuine clay bricks are available in rustic, traditional, and...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Reclaimed Brick Company Leah's Yard Square Sheffield
Reclaimed Brick Company Leah's Yard Square Sheffield

Reclaimed Brick Company is part of Leah's Yard Square in Sheffield, a historic site revitalised for...

Watch Now >>

Day in the life of a Reclamation Yard
Day in the life of a Reclamation Yard

A typical day at a reclamation yard is filled with activity and discovery. Early mornings often...

Watch Now >>

Reclaimed Brick Display at Reclamation Yard
Reclaimed Brick Display at Reclamation Yard

Reclaimed Brick Display at Reclamation Yard

Watch Now >>