Kawneer glazing systems feature on a futuristic transport hub

Public Sector Wed, Dec 19, 2018 3:42 PM

Architectural glazing systems by leading UK manufacturer Kawneer were specified for a transport hub at the heart of the regeneration of an area of Gloucester for their ability to meet a trio of exacting requirements - aesthetics, performance and budget.

Kawneer's AA®100 zone-drained curtain walling, AA®720 thermally superior doors and two types of windows - AA®540 fixed lights and AA®3110 horizontal sliders - were selected by regular Kawneer specifiers BDP architects for the £6.6 million futuristic new Gloucester bus station.

Designed with a single roof plane to resemble an aircraft wing and pay homage to the city's aviation history, the building is a stunning interpretation of the brief which was to deliver an iconic yet affordable transport hub.

The new transport hub forms part of the initial phase of the regeneration of the city's Kings Quarter and will integrate into the retail element with improved pedestrian links to the railway station and city centre.

The facility includes bus stands for 12 vehicles arranged in a chevron format to allow a DIRO (drive in, reverse out) method of operation. It is also equipped with solar panels to power internal lighting and has been designed to be fully accessible for people with disabilities.

With the Kawneer curtain walling at its core, the building is highly transparent to provide maximum visual contact with its surroundings and a calm, airy environment. The width of the public concourse allows ample circulation space as well as waiting and eating areas for individual stands.

As well as providing a dramatic and iconic sculptural form, the roof wing has an aerofoil section and is punctuated at several points to allow further light penetration to the concourse and bus stands.

Passenger information systems, timetable displays, interactive information points, a manned ticket office and a café, as well as a display of the Roman wall that was discovered underneath the foundations, also form part of the facilities.

Built on a brownfield site next to the old bus station, it will serve as a brand-new gateway to the city, replacing the dilapidated building which had stood largely unchanged for 50 years.

BDP architect Nick Fairham said: "The Kawneer systems suited our needs and were within budget. They help to define the public concourse from the bus stands."

The Kawneer systems were installed over 15 weeks of a three-year build by a team of six from approved dealer Aluminium Sashes for main contractor Kier Construction.

Aluminium Sashes' sales director Andrew Mather said: "The design of the main concourse curtain walling included 12 automatic doors allowing access to the external bus bays. These openings gave us an engineering challenge to provide support to the larger glass units above but we overcame this through collaborative design workshops with BDP's structural engineers."

City council leader Cllr Paul James said: "What we have got is a striking building that provides a statement of our ambitions for the city and sets the tone for the rest of the (Kings Quarter) development.

"We are very fortunate to have got Government funding because it would have been very difficult for us to have made it happen without that support."

At the official opening [on Friday 26 October 2018] the station received a cavalcade of 15 vintage buses driven from Gloucester Docks across the city.

Featured News

Specification news
Integrating ceiling tiles with lighting systems

In modern interiors, lighting is about far more than lighting up a room. It defines...

Read More >>

Specification news
Stannah Lifts transforms seven Network rail stations...

Stannah is managing a major accessibility upgrade at several South Western Railway...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

2026 Product Brochure Brochure

2026 Product Brochur...
By ​The Radiator Compan...

Download Now >>

System for Laying Floor and Wall Coverings Brochure

System for Laying Fl...
By FassaFloor

Download Now >>

Training for Excellence Brochure

Training for Excelle...
By Aico

Download Now >>

The Connected Home Solution Brochure

The Connected Home S...
By Aico

Download Now >>

Safety First, Aico First Brochure

Safety First, Aico F...
By Aico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Glass Partition Walls
Glass Partition Walls

Partition wall systems made of glass allow transparent room partition. They open, divide and...

Read More >>

FASSAFILL MEDIUM
FASSAFILL MEDIUM

Water repellent cement-based sealant for grouting joints from 2 to 12 mm, resistant to mould and...

Read More >>

FASSA AQUAZIP FAST
FASSA AQUAZIP FAST

Two-component elastic cement membrane, quick drying even at low temperatures, for waterproofing and...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

DAB EsyBox Pop | Compact booster pump for perfect home water pressure
DAB EsyBox Pop | Compact booster pump for perfect home water pressure

Struggling with weak showers and inconsistent flow? The DAB EsyBox Pop is the revolutionary,...

Watch Now >>

Marsh Industries - Phos-Lite
Marsh Industries - Phos-Lite

Marsh Industries - Phos-Lite

Watch Now >>

Marsh Industries - Nutra-Lite
Marsh Industries - Nutra-Lite

Marsh Industries - Nutra-Lite

Watch Now >>