Fire doors from five suppliers fail to meet fire performance standard

Latest News Wed, Aug 1, 2018 7:55 AM

Fire doors from five suppliers have now been identified as failing to meet requisite fire performance standard following an on-going investigation by the Ministry of Housing, Communities and Local Government (MHCLG).

This highlights broader potential failings within the industry and the Government is taking immediate action to address this.

MHCLG began investigating the fire door industry after it was found that a glazed, composite fire door from Grenfell Tower manufactured by Manse Masterdor failed a 30 minute fire resistance test after approximately 15 minutes.

Issues were subsequently identified with doors produced by Masterdor Limited (the successor business to Manse Masterdor). Investigations have continued and in the last few days doors from 3 additional manufacturers have failed fire resistance testing when tested on both sides.

MHCLG is writing to all building control bodies highlighting the need to check that existing building regulations guidance on new fire door installations is followed. The guidance sets out the tests which should be performed – including testing doors on both sides – in order to meet building regulations requirements.

The Secretary of State for Communities has instructed major fire door suppliers to meet this week and agree a clear plan of action to tackle the failings which have been identified, with weekly reports on progress.

The government’s Independent Expert Panel and the National Fire Chiefs Council have advised that the additional risk to public safety is low, as even when not meeting full resistance standards fire doors will provide some protection from the spread of fire and are part of layered fire protection systems within buildings.

James Brokenshire said: "While the department’s investigations are on-going, I now have enough evidence to suggest that there is a broader issue across the fire door market. That is why I am calling on suppliers to meet this week and provide reassurance that they are gripping this issue properly.

"I want to see a clear plan of action to rectify existing problems and ensure such failures are not repeated in the future. Whilst our Expert Panel assures me the risk remains low I want to assure the public that the government is doing everything it can to ensure construction products are of the highest safety standards and accurately tested and marketed."

The Secretary of State has also asked National Trading Standards to oversee local investigations which are taking place. MHCLG will also work with third party certification bodies to develop minimum standards of assurance to provide building owners with greater confidence in the fire doors they purchase.

The products which have failed government tests to date were glazed and unglazed doors supplied by Manse Masterdor and Masterdor Limited and glazed composite doors supplied by Specialist Building Products Limited, trading as Permadoor; Solar Windows Limited; and Birtley Group Limited, trading as Bowater by Birtley.

All doors that are known to have failed to meet the necessary standards have been withdrawn from the market and the department has informed local trading standards of its findings. Each manufacturer has co-operated fully with the government’s investigations, which are continuing.

Featured News

Specification news
New and updated CLC HRB Building Safety guidance

The Construction Leadership Council (CLC) has published two new guidance notes on the...

Read More >>

Specification news
LUCECO DRIVES PREMIUM LIGHTING TRANSFORMATION AT BERRY...

Luceco has played a central role in the £5 million refurbishment of Berry Group’s...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Cedral Roofs Brochure Brochure

Cedral Roofs Brochur...
By Cedral by Etex

Download Now >>

Cedral Facades Brochure Brochure

Cedral Facades Broch...
By Cedral by Etex

Download Now >>

2026 Product Brochure Brochure

2026 Product Brochur...
By ​The Radiator Compan...

Download Now >>

System for Laying Floor and Wall Coverings Brochure

System for Laying Fl...
By FassaFloor

Download Now >>

Training for Excellence Brochure

Training for Excelle...
By Aico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Cedral Thrutone Textured
Cedral Thrutone Textured

Cedral - Thrutone Textured slates have an attractive textured surface with square edges which...

Read More >>

Cedral Board
Cedral Board

Cedral Board helps you to create an attractive and consistent look down to the very last detail....

Read More >>

Cedral Click
Cedral Click

Cedral Click is a flush fitting tongue and groove cladding that can be fitted vertically or...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

DAB EsyBox Pop | Compact booster pump for perfect home water pressure
DAB EsyBox Pop | Compact booster pump for perfect home water pressure

Struggling with weak showers and inconsistent flow? The DAB EsyBox Pop is the revolutionary,...

Watch Now >>

Marsh Industries - Phos-Lite
Marsh Industries - Phos-Lite

Marsh Industries - Phos-Lite

Watch Now >>

Marsh Industries - Nutra-Lite
Marsh Industries - Nutra-Lite

Marsh Industries - Nutra-Lite

Watch Now >>