Latest News Tue, Feb 27, 2018 9:38 AM
New best practice guide sets new standard for time management in building and civil engineering projects in the latest publication from the Chartered Institute of Building (CIOB).
Delayed completion affects all project based industries in all countries and the bigger the project, the more damage delayed completion causes to costs, reputation and sometimes even to the survival of the contracting parties themselves.
First published in 2010, the Guide to Good Practice in the Management of Time in Major Projects was an integral part of the CIOB’s strategy to provide standards, education, training and accreditation in time management. The latest edition emphasises dynamic, strategic time modelling as the way to manage time and cost in major projects.

“On major projects the failure strategically to manage time so often proves disastrous, not just for the contractor but also for the client, its consultants, and for the rest of the supply chain,” said Keith Pickavance, author and Past President of the CIOB.
“This Guide is a step-by-step illustration of how the parties can work collaboratively to meet this challenge using traditional project procurement routes or the most advanced BIM, from the adoption of a workable time-management strategy through to the day to day detail of risk management, using a predictive time model.”
The publication includes new materials, such as a chapter distinguishing the principal features of the dynamic time model and its development throughout the life of a project, from inception to completion. It also includes new appendices covering matters such as complexity in construction and engineering projects, productivity guides and a number of case studies.
The publication is the ideal handbook for project and program management professionals working in civil engineering and construction projects, including those from contractors, clients and project management consultants.
Featured News
Richard Braid, Managing Director of water saving experts Cistermiser and Keraflo, has...
The DRAINFIX BLOC HD crate system marks HAURATON’s expansion into the area of...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
2026 Product Brochur...
By The Radiator Compan...
System for Laying Fl...
By FassaFloor
Training for Excelle...
By Aico
The Connected Home S...
By Aico
Safety First, Aico F...
By Aico
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Partition wall systems made of glass allow transparent room partition. They open, divide and...
Water repellent cement-based sealant for grouting joints from 2 to 12 mm, resistant to mould and...
Two-component elastic cement membrane, quick drying even at low temperatures, for waterproofing and...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Struggling with weak showers and inconsistent flow? The DAB EsyBox Pop is the revolutionary,...