WILO Pumps Help Energy Efficiency In Isle Of Man Hospital

Latest News Tue, Jan 9, 2018 2:14 PM

Nobles Hospital sits just outside the Isle of Man’s capital, Douglas. The majority of pumps incorporated in the development are the ones that were in the original construction back in 2003.

The project to improve the energy efficiency of the hospital has been led by Paul Bevan, Building Services Engineer, Public Estates and Housing for the Department of Infrastructure on the island. Wilo was pleased to be asked to take a look at the options available and to illustrate significant savings available across the hospital estate by replacing existing pumps with new energy efficient Wilo alternatives.

Wilo has supplied 32 pumps to the hospital, 14 of which have already been installed. The others will be installed as part of a gradual replacement programme in the coming months. Already the Pathology department, the theatres, Intensive Care Unit, Accident and Emergency and Fractures clinic and the Estates and Kitchens areas have been switched to new pumps.

In addition, Wilo has supplied one BL pump with a Danfoss inverter. This is fitted to the primary chilled water circuit and was used as the initial trial product for the project. There are a further seven of these pumps to be installed on the chilled water circuits, which are supplied by two 400kW water chillers and an ICE storage unit.

As an example of the savings achievable, the BL pump installed on the chilled water system as the initial trial product for the project, is so far delivering £11,000 per annum in savings when compared to its fixed speed predecessor, based on £0.14 per kWh.

To find out more about Wilo’s Energy Solutions expertise and its wide range of high efficiency pumps and pumping systems, visit www.wilo.co.uk or call 01283 523000 for more information.

Featured News

Specification news
New trade measures to support steel sector

Steel producers across the UK will benefit from stronger trade measures from 1 July,...

Read More >>

Specification news
INSTANTOR INTRODUCES R-PRESS – A NEW RANGE OF PRESS...

Providing a safer, faster way to join pipework, Instantor has developed brand new...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

HPS200 Ultra Case Study Brochure Brochure

HPS200 Ultra Case St...
By Tata Steel

Download Now >>

Confidex Datasheet Brochure

Confidex Datasheet
By Tata Steel

Download Now >>

Prisma UK 2024 Brochure

Prisma UK 2024
By Tata Steel

Download Now >>

HPS200 Ultra UK Brochure

HPS200 Ultra UK
By Tata Steel

Download Now >>

Amtico Bio Support Document  Brochure

Amtico Bio Support D...
By Amtico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

​The Confidex® Guarantee
​The Confidex® Guarantee

Offers the most comprehensive guarantee for pre-finished steel products in Europe and provides peace...

Read More >>

Colorcoat HPS200 Ultra®
Colorcoat HPS200 Ultra®

Colorcoat HPS200 Ultra®Super durable guaranteed performance.Designed to withstand even the most...

Read More >>

Prisma
Prisma

Colorcoat Prisma®Aesthetics that last, guaranteed.Colorcoat Prisma® demonstrates a step change by...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>