Time saving panel greatly reduces drylining install time on residential project

Latest News Fri, Sep 22, 2017 9:10 AM

SMARTPLY DRYBACKER, an innovative factory-prepared oriented strand board (OSB), has greatly reduced the time spent on the latest big build project for drylining contractor SD Plastering.

The project, based in Surrey Quays, Canada Water, London has seen 280 commercial and residential units take shape over the past two years with an additional 160 to follow on.

Specially designed to speed up install times whilst adding strength to partitions, SMARTPLY DRYBACKER was chosen to provide support for heavy fixtures and fittings secured through the plasterboard.

The product features a pre-cut recess in the rear of the panel, designed to accommodate ‘C’ shaped metal studs meaning the panel will fit snugly to most commercially available drylining systems. The pre-sized modular format and factory cut groove mean there is no requirement for cutting or modifying on site eliminating excess dust and noise.

“Pre-rebating the product means that we increase the usability to the installer, doing away with time spent cutting and sizing the product on site,” says David Murray, Innovation Manager at MEDITE SMARTPLY.

“Our aim when creating this product was the same as all of our innovation projects: to solve the problems encountered everyday by end users. With SMARTPLY DRYBACKER we identified the need to cut down time adjusting and cutting panels on site, which can cause unnecessary hold ups in construction projects.”

SMARTPLY DRYBACKER is the first of its kind to be factory prepared in this manner, and contractors are reaping the rewards.

“The fact that the boards do not require cutting on site is a really important benefit for us. It saves my teams and I a lot of time cutting the panels down, then rebating individual slots in each board. As a result, we also have less power tools on site, which reduces cause for concern around health and safety,” says Simon Dixon, Managing Director at SD Plastering.

“As you can imagine, cutting that amount of board on site also creates a lot of dust. Eliminating the need to cut the boards removes this extra hazard, further reducing risk to our workers.”

“We needed enough board to fit out 280 units, so if a product can save us five minutes on each board installed then we can save ourselves a matter of days over an entire project, which makes us and our clients very happy.It’s for those reasons that we’ll be using SMARTPLY DRYBACKER again when we push for the next stage of the project this year.”

With reduced installation time, reduced dust, reduced noise and reduced use of power tools on site, SMARTPLY DRYBACKER certainly is the superfast, heavyweight champion.

For more info, please visit www.mdfosb.com

Featured News

Specification news
Pioneering pathways towards a net zero built...

The 2024 CIBSE Technical Symposium, hosted at the Welsh School of Architecture,...

Read More >>

Specification news
CIH appoint new chair designate

Chartered Institute of Housing (CIH) has announced John Hannigan FCIH FCCA CDIR as...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

FRAMESAFE FR A2 FIRE RATED EXTERNAL WALL BREATHER MEMBRANE  Brochure

FRAMESAFE FR A2 FIRE...
By Glidevale Protect

Download Now >>

A Guide to Aluminium Fencing Brochure

A Guide to Aluminium...
By F.H. Brundle

Download Now >>

Handrailing & Balustrade Systems Brochure

Handrailing & Balust...
By F.H. Brundle

Download Now >>

RLG600 Access Flooring System Brochure

RLG600 Access Floori...
By Kingspan Data & Floo...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Straightcurve®
Straightcurve®

Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...

Read More >>

RLG600 Access Flooring System
RLG600 Access Flooring System

The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...

Read More >>

RHG600 Simploc
RHG600 Simploc

Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Straightcurve® Product Range Overview - A Demonstration of Installation Ease
Straightcurve® Product Range Overview - A Demonstration of Installation Ease

Straightcurve® Product Range Overview - A Demonstration of Installation Ease

Watch Now >>

Forma aluminium column casings for Winchester College
Forma aluminium column casings for Winchester College

In progressive and dynamic business sectors, such as construction, it’s natural to be forward...

Watch Now >>

Decorative metal bulkheads & column casings for Tesco Extra, Birmingham
Decorative metal bulkheads & column casings for Tesco Extra, Birmingham

Decorative aluminium horizontal bulkheads more than 100 metres long have been supplied and installed...

Watch Now >>