ELCO boilers set for new term

Education Tue, Oct 11, 2016 11:26 AM

As part of the complete refurbishment of the plant room, five THISION L EVO 140kW boilers from ELCO have been installed at Horringer Court School in Bury St Edmunds, Suffolk.

The new boilers have been arranged back to back on the THISION free standing cascade frame – maximising output capacity in a restricted area.

The highly efficient THISION L EVOs have replaced two ageing floor-standing pressure jet units, which had been in operation for over 40 years. The upgrade will provide the school with improved efficiencies and long term reliability, thanks in part to the high quality construction of the ELCO boilers.

The Horringer Court School has recently experienced a significant change in its education system, having adopted the forward thinking ‘All-Through’ approach. This allows the school to focus solely on its core mission of helping every pupil to reach his or her potential by providing a seamless education from the ages of 4-19.

With the boiler upgrade, the school’s forward thinking stance on education will coincide with a new era of heating technology. The installed THISION L EVO units are a completely re-engineered range of commercial boiler, utilising the finest technological features and components, while offering powerful outputs from 60kW to 140kW.

Chris Jennings, Director at Sutton Coldfield-based Hydro Mechanical Services Ltd, specified the ELCO boilers and the back to back cascade frame. Commenting on the project, he said: “The existing boilers were old and becoming problematic for the school so, after careful due diligence of the heating system and the requirements of a new design, we opted for the THISION L EVO boilers as the best replacement.

“Due to the nature of the building, the plant room refurbishment needed completing within the six-week period of the school summer holidays. So, given this restricted schedule, we needed a high-quality solution that could be installed within the fixed timeframe. Having used ELCO boilers previously, we knew they would be a great fit for the project and we could rely on the company for a reliable and quick service.”

The THISION boilers are operating at the school in a fully modulating cascade arrangement to provide excellent flexibility and reliability, with all five units sharing a new flue system to accommodate this configuration. ELCO’s in line and back to back cascade arrangements facilitate quick installation of systems up to 1.1MW — even in limited plant room spaces. The pre-fabricated cascade rigs can also be easily transported on site and set up by just one person.

Chris Jennings from Hydro Mechanical commented: “It’s the first time we’ve used the back to back arrangement, and the engineers on site really liked the flexibility and ease of assembly.”

Brett Stokes, Area Sales Manager for ELCO Heating Solutions, was closely involved with the project. He said: “With the new plant installation serving the entire school building, we were keen to offer a versatile system, so the back to back cascade setup was a great option. The project also coincided with the recent launch of the THISION L EVO boiler, so staff and pupils at the school will benefit from energy efficient heating and hot water production all year round.”

Outstanding features of the THISION L EVO include: a flat metal fibre cold flame burner for extremely low NOx emissions; a robust stainless steel heat exchanger with double wall geometry providing superb heat transfer; extensive cascade arrangements for powerful and flexible systems; plus the latest control functionality to ensure optimum performance.

Featured News

Specification news
Combining safety and aesthetics at new academy

When it comes to constructing schools, colleges and universities, it’s important to...

Read More >>

Specification news
Specifying for specialist teaching spaces

With a diverse range of subjects taught in secondary schools, Dave Ford,...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

FRAMESAFE FR A2 FIRE RATED EXTERNAL WALL BREATHER MEMBRANE  Brochure

FRAMESAFE FR A2 FIRE...
By Glidevale Protect

Download Now >>

A Guide to Aluminium Fencing Brochure

A Guide to Aluminium...
By F.H. Brundle

Download Now >>

Handrailing & Balustrade Systems Brochure

Handrailing & Balust...
By F.H. Brundle

Download Now >>

RLG600 Access Flooring System Brochure

RLG600 Access Floori...
By Kingspan Data & Floo...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Straightcurve®
Straightcurve®

Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...

Read More >>

RLG600 Access Flooring System
RLG600 Access Flooring System

The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...

Read More >>

RHG600 Simploc
RHG600 Simploc

Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Straightcurve® Product Range Overview - A Demonstration of Installation Ease
Straightcurve® Product Range Overview - A Demonstration of Installation Ease

Straightcurve® Product Range Overview - A Demonstration of Installation Ease

Watch Now >>

Forma aluminium column casings for Winchester College
Forma aluminium column casings for Winchester College

In progressive and dynamic business sectors, such as construction, it’s natural to be forward...

Watch Now >>

Decorative metal bulkheads & column casings for Tesco Extra, Birmingham
Decorative metal bulkheads & column casings for Tesco Extra, Birmingham

Decorative aluminium horizontal bulkheads more than 100 metres long have been supplied and installed...

Watch Now >>