GRAHAM appointed for £20m Lincoln's Inn Great Hall works

Latest News Mon, Jul 4, 2016 10:13 AM

GRAHAM Construction has been appointed by the Honourable Society of Lincoln’s Inn to carry out a major, £20m conservation and extension project on the Grade II* listed Great Hall and Library, situated within the Bloomsbury Conservation Area in High Holborn.

Developments to Lincoln’s Inn have been made during each century, but this is the biggest single project since its original construction. The listed Great Hall and Library, completed in 1845 and 1873 respectively, are impressive buildings of historic importance that form the collegiate heart of the Inn.

They will be carefully restored and refurbished to preserve future use, alongside the construction of two sensitive extensions to add to the Inn’s educational facilities.

The Great Hall currently houses the Inn’s principal dining hall, member’s common room, associated catering and event facilities, visitor reception and administrative support offices. Works will include the reopening of the main entrance door, an upgrade of the kitchen, drainage and damp proofing and the original configurations and finishes will be reinstated and conserved.

A 1,247 sq m, two-storey extension will be constructed below ground under the East Terrace of the Great Hall. A day-lit basement will provide much-needed state-of-the-art teaching facilities comprised of a large, multi-purpose lecture theatre and mooting space, 10 flexible advocacy training rooms, quiet study and break-out areas, and additional social meeting spaces.

The new four-storey Library extension will be contiguous with the existing building, offering an additional 565 sq m space for books, an archive, a reading room and support spaces. With one floor underground and three above, it will provide step-free access increasing the access to the collection from 30% to 80%. The new education centre will double the size of the existing space and accommodate the growing educational programme.

Informed by a Statement of Significance, a long-standing Inn Heritage Assessment and accompanied by a comprehensive Heritage Statement, the designs are respectful of the historic context of Lincoln’s Inn. Sustainability has been an important consideration and the scheme is expected to achieve a BREEAM Very Good rating. It has also been coordinated to minimise disruption on the Inn and its neighbours.

Philip Ardley, Interim Director of Estates at The Honourable Society of Lincoln’s Inn said: “This is a very exciting, but complex and potentially sensitive project, for the Inn. We are very much looking forward to working with GRAHAM Construction to deliver this, whilst making every effort to respect the challenges that this will bring to our tenants.”

Rob Joyce, GRAHAM Construction’s London office director, said: “Lincoln’s Inn is a longstanding institution that prepares future barristers for Call to the Bar. The conservation and extension works will preserve and enhance the building for future students and add to the vital functions it provides to its members and the judiciary.

"The restoration of such a significant historic and architectural property requires great skill and makes this a highly rewarding project for our team.”

Work is due to start on site next month with a projected completion for December 2017.

Image: Rick Mather Architects

Featured News

Specification news
Hybrid tapes: future proof buildings and property

With their ability to expand and contract to guarantee seals that alternative wet...

Read More >>

Specification news
TRILUX Opens London Light Studio to Strengthen Customer...

Light. Space. Dialogue.TRILUX has opened a new Light Studio in Charterhouse Square,...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

2026 Product Brochure Brochure

2026 Product Brochur...
By ​The Radiator Compan...

Download Now >>

System for Laying Floor and Wall Coverings Brochure

System for Laying Fl...
By FassaFloor

Download Now >>

Training for Excellence Brochure

Training for Excelle...
By Aico

Download Now >>

The Connected Home Solution Brochure

The Connected Home S...
By Aico

Download Now >>

Safety First, Aico First Brochure

Safety First, Aico F...
By Aico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Glass Partition Walls
Glass Partition Walls

Partition wall systems made of glass allow transparent room partition. They open, divide and...

Read More >>

FASSAFILL MEDIUM
FASSAFILL MEDIUM

Water repellent cement-based sealant for grouting joints from 2 to 12 mm, resistant to mould and...

Read More >>

FASSA AQUAZIP FAST
FASSA AQUAZIP FAST

Two-component elastic cement membrane, quick drying even at low temperatures, for waterproofing and...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

DAB EsyBox Pop | Compact booster pump for perfect home water pressure
DAB EsyBox Pop | Compact booster pump for perfect home water pressure

Struggling with weak showers and inconsistent flow? The DAB EsyBox Pop is the revolutionary,...

Watch Now >>

Marsh Industries - Phos-Lite
Marsh Industries - Phos-Lite

Marsh Industries - Phos-Lite

Watch Now >>

Marsh Industries - Nutra-Lite
Marsh Industries - Nutra-Lite

Marsh Industries - Nutra-Lite

Watch Now >>