Complete drainage solution for new hospital

Latest News Wed, May 18, 2016 11:22 AM

Saint Gobain PAM is supplying a complete above ground sanitary soil and internal rainwater drainage system for the new £429 million Royal Liverpool University hospital in Liverpool.

The new purpose built hospital will have 23 wards with 646 single bedrooms and 18 operating theatres. Each patient will have a single bedroom with ensuite facilities making it the largest all single room hospital in England and Wales when it is completed.

Says Malcolm Atherton, Public Health Design Engineer at Hoare Lea, Manchester: “We prefer using Saint Gobain PAM’s cast iron Ensign Soil system because of its superior acoustic performance and fire safety when compared to other pipe materials, especially in a hospital environment. Patient comfort and safety are both top priorities for hospitals.

“It is also durable and designed to last the lifetime of the hospital with minimal maintenance and is resistant to any possible damage whether accidental or deliberate.”

In addition to the Ensign Soil drainage system, the company is also supplying products from its new Vortx range including plant gullies, shower drains and roof outlets, ductile iron pipe-fittings for the pump drainage systems and grip collars which are fitted to ductile iron couplings to provide higher-pressure drainage applications for sensitive drainage areas.

Says Richard Smith, sales engineer for Saint Gobain PAM: “We have a wider range of products and fittings than other suppliers which for an application as diverse as this is vital. As a UK manufacturer we can also meet the project’s supply needs and deal with any unusual specifications promptly.

“An example of this is with the shower drains for level 4 of the building, which had to be supplied with various different spigot lengths already fitted to them, in order to speed up installation time. These spigots could be up to 2.8 metres in length as they had to pass through a concrete beams of different depths and then simply push straight into the connection below.”

The new hospital is due to be completed in 2017 and the main contractor for the build is Carillion.

Featured News

Specification news
London and Edinburgh remain top destinations for hotel...

Executives and investors from the hotel industry have ranked London as the most...

Read More >>

Specification news
The use of AI in EIAs

A new report on the use of Artificial Intelligence (AI) in Environmental Impact...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

ACO Blue Roof Guide – Vol 2 Brochure

ACO Blue Roof Guide...
By ACO Building Drainag...

Download Now >>

Stannah Commercial Brochure Brochure

Stannah Commercial B...
By Stannah Group

Download Now >>

Stannah Midilift CLS Brochure

Stannah Midilift CLS
By Stannah Group

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Supreme Heavy-Duty Loft Ladder
Supreme Heavy-Duty Loft Ladder

The Supreme heavy-duty loft ladder is supplied as a ready to fit unit. It is manufactured from high...

Read More >>

Designo Loft Ladder
Designo Loft Ladder

Insulated and Airtight wooden loft ladder……sets the standard for long-lasting quality and...

Read More >>

Elite Loft Ladder
Elite Loft Ladder

The Elite heavy-duty loft ladder...The Elite heavy duty concertina loft ladder is supplied without a...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Proctor Air® Product Explainer
Proctor Air® Product Explainer

Proctor Air® is an air and vapour permeable, highly water resistant roofing underlay. Its...

Watch Now >>

Discover the Power of Blue Roofs in Urban Flood Management
Discover the Power of Blue Roofs in Urban Flood Management

In this video, we explore how blue roofs are transforming urban landscapes by helping to mitigate...

Watch Now >>

RMD Profiles - UK Experts in Metal Decking, Design Installation
RMD Profiles - UK Experts in Metal Decking, Design Installation

At RMD Profiles, we’re more than just metal decking. From supply-only solutions to full design and...

Watch Now >>