Public Sector Wed, Mar 23, 2016 9:10 AM
Cable management specialist, Unitrunk has supplied the New South Glasgow Hospital with cable ladder, tray and trunking as part of the extensive power infrastructure for the showpiece £842 million new hospital.
Boasting 1109 patient beds over 14 storeys, the New South Glasgow Hospital will be one of the largest acute hospitals in Europe when it opens in May and will offer specialist care for renal medicine, transplantation and vascular surgery along with state-of-the-art critical care, theatre and diagnostic facilities.
The largest ever investment in a hospital build project in Scotland, New South Glasgow Hospital will offer state of the art facilities and the cable management provided by Unitrunk forms the infrastructure for all high voltage cabling, small power and lighting throughout the hospital campus.
The hospital marks a move away from ward-based care to private rooms, with every patient having their own en-suite rooms with views out across the campus.
The project builds on Unitrunk’s experience of hospital schemes, which also includes Edith Cavell Hospital and Heath Children’s Hospital in South Wales and the company’s Rapid Installation Systems (RIS) approach means that its products are ideally suited to the time critical programmes involved in delivering high profile health sector developments.
Featured News
From large-format porcelain installations to demanding commercial interiors, grout...
Harmer SML Below-Ground Drainage is a trusted soil and waste system from Alumasc...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
2026 Product Brochur...
By The Radiator Compan...
System for Laying Fl...
By FassaFloor
Training for Excelle...
By Aico
The Connected Home S...
By Aico
Safety First, Aico F...
By Aico
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
PYRAN® fire-resistant glazing is superior to conventional safety glass for a number of reasons....
Partition wall systems made of glass allow transparent room partition. They open, divide and...
Water repellent cement-based sealant for grouting joints from 2 to 12 mm, resistant to mould and...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Struggling with weak showers and inconsistent flow? The DAB EsyBox Pop is the revolutionary,...