Topping out ceremony to mark The Diamond progress

Education Wed, Mar 23, 2016 9:09 AM

Topping out ceremony to mark The Diamond progress

Professor Mike Hounslow, Pro Vice-Chancellor for the Faculty of Engineering at the University of Sheffield, was today (23 January 2015) joined by Sheffield Central MP Paul Blomfield on the roof of The Diamond building to perform the official topping out ceremony to mark progress on the £81 million development.

Scheduled to open for teaching this September, the University of Sheffield’s largest ever investment in teaching and learning will create a fantastic place for modern multidisciplinary teaching. As well as specialist engineering teaching facilities, the six storey building will also house a range of lecture theatres, seminar rooms, open-plan learning spaces, library and IT services, and plenty of space for informal get-togethers.

Building work began in autumn 2013 and the city has seen the remarkable transformation from groundwork preparation to the now completed framework of The Diamond at the heart of the University campus.

Over the next couple of months, The Diamond will acquire its dramatic external facade of anodised aluminium, and work is already well underway to complete the internal layout, which includes a chemical engineering pilot plant, a semi-conductor clean room, a flight simulator and control room and a virtual reality suite. The building will also include an extension of the University’s award-winning Information Commons, with around 1,000 innovative study spaces.

Speaking at the topping out event, Professor Mike Hounslow said that The Diamond would not only provide a wonderful space for students and staff, but was a vital part of the University’s wider commitment to see engineering and high value manufacturing at the heart of the City Region’s economic future.

“The research carried out within our Faculty of Engineering, much of it world-leading, is translated into practical applications at our Advanced Manufacturing Research Centre (AMRC) with Boeing.  Investment of the kind we are seeing here is part of the reason there has been a 25 per cent increase in the number of students wishing to study engineering at the University of Sheffield this year. We are grateful to the support we have had locally and nationally that means we are in a position to give more students the opportunity to study here. ”

Paul Blomfield MP said The Diamond represented a fantastic opportunity, not just for the University, but for the city as a whole.

“A building of this impact and quality demonstrates clearly to the rest of the UK and the international education community that we have a University with vision and drive. An independent study carried out in the initial planning stages for The Diamond demonstrated the significant impact it would have on the local and regional economy in terms of jobs and wider spending, and it’s great to see this major investment nearing completion.

"Along with its work at the AMRC, this development puts the University at the forefront of engineering teaching and research internationally, with huge benefits for the local economy and the creation of jobs.”

The topping out team were also accompanied by Allan Grantham, Project Director, Balfour Beatty, who won the contract to deliver this challenging building.  Speaking at the event, Allan said: “This topping out event is a great opportunity to recognise a key milestone on The Diamond project. As we now progress towards completion, with the fit out phase of the project well under way, we look forward to this flagship project welcoming its first students.”

Featured News

Specification news
HKC announces integration with Abloy SMARTair for...

HKC Security has announced a new integration with Abloy’s SMARTair access control...

Read More >>

Specification news
Edinburgh high school looks forward to Passivhaus...

As of May 2025, construction of the new £65 million Currie Community High School in...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

2026 Product Brochure Brochure

2026 Product Brochur...
By ​The Radiator Compan...

Download Now >>

System for Laying Floor and Wall Coverings Brochure

System for Laying Fl...
By FassaFloor

Download Now >>

Training for Excellence Brochure

Training for Excelle...
By Aico

Download Now >>

The Connected Home Solution Brochure

The Connected Home S...
By Aico

Download Now >>

Safety First, Aico First Brochure

Safety First, Aico F...
By Aico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Glass Partition Walls
Glass Partition Walls

Partition wall systems made of glass allow transparent room partition. They open, divide and...

Read More >>

FASSAFILL MEDIUM
FASSAFILL MEDIUM

Water repellent cement-based sealant for grouting joints from 2 to 12 mm, resistant to mould and...

Read More >>

FASSA AQUAZIP FAST
FASSA AQUAZIP FAST

Two-component elastic cement membrane, quick drying even at low temperatures, for waterproofing and...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

DAB EsyBox Pop | Compact booster pump for perfect home water pressure
DAB EsyBox Pop | Compact booster pump for perfect home water pressure

Struggling with weak showers and inconsistent flow? The DAB EsyBox Pop is the revolutionary,...

Watch Now >>

Marsh Industries - Phos-Lite
Marsh Industries - Phos-Lite

Marsh Industries - Phos-Lite

Watch Now >>

Marsh Industries - Nutra-Lite
Marsh Industries - Nutra-Lite

Marsh Industries - Nutra-Lite

Watch Now >>