Titan Group appointed main contractor on new build scheme

Housing Wed, Mar 23, 2016 9:15 AM

Titan Group appointed main contractor on new build scheme

Titan Group, a specialist provider of built-environment services, has been appointed as the main contractor for the construction of new student housing in Nottingham city centre.

Haas Group, who specialise in residential, student accommodation and PRS developments in the UK, have been appointed development manager.

The project is being run in collaboration with Nottingham based architects CBP Architects and BWB Consulting, a commercial engineering consultancy, also based in Nottingham.

The 77-bed student-housing scheme, on 95 Talbot Street, is expected to take 52 weeks, with completion expected in time for the start of the September 2016 academic year.

The site will be handed-over to Empiric Student Property PLC (‘ESP’) at practical completion. Empiric are an internally managed UK REIT investing in modern, premium student accommodation located in prime central locations in top university towns and cities in the UK.

Research by JLL earlier this month found there is likely to be a shortfall of 25,000 student beds this year following Chancellor George Osborne’s decision to remove the cap on student numbers.

Rory Chichester, Managing Director at Titan said: This project sees us furthering our student project pipeline within key locations in the UK and we are very pleased to be working with HAAS Group and ESP. We look forward to establishing a successful working relationship with both of these important customers.”

Owain Thomas, Director of Haas Group comments: "We’re currently growing our land-bank of sites in key regional cities and are looking forward to driving these projects forward over the next 12 months with the potential for further work withTitan."

Steve Willis, Account Director of Construction at Titan said: "Titan is delighted to be a part of the construction of such a progressive new design and look forward to collaborating with Haas, CBP and BWB over the coming year.”

Featured News

Specification news
CUPA PIZARRAS natural slate helps revive 19th century...

CUPA R12 Excellence slate from CUPA PIZARRAS has been installed as part of a ...

Read More >>

Specification news
Intrastack is setting the bar high with its Low-Rise...

Intrastack, part of the Saint-Gobain Off-Site Solutions division and leader in...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

FRAMESAFE FR A2 FIRE RATED EXTERNAL WALL BREATHER MEMBRANE  Brochure

FRAMESAFE FR A2 FIRE...
By Glidevale Protect

Download Now >>

A Guide to Aluminium Fencing Brochure

A Guide to Aluminium...
By F.H. Brundle

Download Now >>

Handrailing & Balustrade Systems Brochure

Handrailing & Balust...
By F.H. Brundle

Download Now >>

RLG600 Access Flooring System Brochure

RLG600 Access Floori...
By Kingspan Data & Floo...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Straightcurve®
Straightcurve®

Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...

Read More >>

RLG600 Access Flooring System
RLG600 Access Flooring System

The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...

Read More >>

RHG600 Simploc
RHG600 Simploc

Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Straightcurve® Product Range Overview - A Demonstration of Installation Ease
Straightcurve® Product Range Overview - A Demonstration of Installation Ease

Straightcurve® Product Range Overview - A Demonstration of Installation Ease

Watch Now >>

Forma aluminium column casings for Winchester College
Forma aluminium column casings for Winchester College

In progressive and dynamic business sectors, such as construction, it’s natural to be forward...

Watch Now >>

Decorative metal bulkheads & column casings for Tesco Extra, Birmingham
Decorative metal bulkheads & column casings for Tesco Extra, Birmingham

Decorative aluminium horizontal bulkheads more than 100 metres long have been supplied and installed...

Watch Now >>