Housing Wed, Mar 23, 2016 10:35 AM
As part of a refurbishment programme to extend the lifespan of over 80 houses in Rotherham, South Yorkshire, Sika has supplied a range of high performance repair and protection solutions that will help to preserve the buildings’ aesthetics and performance standards for years to come. At the housing estate in Rawmarsh, Rotherham Metropolitan Borough Council appointed main contractor Hall Construction Group Ltd to complete a series of improvements including the application of new external wall insulation, cladding and roofing systems. With many homes also requiring structural repairs, a range of systems was required to maintain the concrete elements and protect the steel reinforcements from future deterioration.
Featured News
Pulse Fibre has announced a partnership with untypical, the housebuilding group...
Richard Cook, Technical Director at international slate specialists SSQ, explains why...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
Proctors Spacetherm...
By A Proctor Group Ltd.
Proctors Proctor Pas...
By A Proctor Group Ltd.
Proctors Air Brochur...
By A Proctor Group Ltd.
Proctors Modular & O...
By A Proctor Group Ltd.
Proctors Hamm Princi...
By A Proctor Group Ltd.
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Membrane composed of elastomer modified bitumen and a non woven polyester reinforcement.The upper...
Membrane composed of flexible PVC and a polyester reinforcement. Available in different RAL...
Membrane composed of flexible PVC. Available in different RAL Colours.Used for detailing work. The...
CONSTRUCTION VIDEOS - LATEST VIDEOS
https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....
A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...
We designed and installed a new dining area canopy for John Spendluffe Technology College. This has...