Latest News Wed, Mar 23, 2016 9:08 AM
The main production area of the Express Contract Drying factory in South Wales required refurbishment. The existing slabs created significant substrate challenges due to the mixture of old finishes and bare concrete.
TPS360, the contractor for the project, was instructed to produce a new floor finish that needed to be slip resistant with good chemical resistance whilst providing an attractive and highly durable finish.
Remmers Floormix DQ flooring system was chosen for its special blend of decorative colour quartz aggregate and extreme durability which was ideally suited for this application.
Due to time constraints on the program, fast curing resin screeds were installed, to falls, to an exacting standard to avoid ponding.
Featured News
While the wider construction industry has faced a challenging summer marked by...
In spring 2022, Galapagos opened its new headquarters in the Leiden Bio Science Park...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
ACO Blue Roof Guide...
By ACO Building Drainag...
Stannah Commercial B...
By Stannah Group
Levelmaster
By Stannah Group
Trolleylift
By Stannah Group
Stannah Midilift CLS
By Stannah Group
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
The Supreme heavy-duty loft ladder is supplied as a ready to fit unit. It is manufactured from high...
Insulated and Airtight wooden loft ladder……sets the standard for long-lasting quality and...
The Elite heavy-duty loft ladder...The Elite heavy duty concertina loft ladder is supplied without a...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Proctor Air® is an air and vapour permeable, highly water resistant roofing underlay. Its...
In this video, we explore how blue roofs are transforming urban landscapes by helping to mitigate...
At RMD Profiles, we’re more than just metal decking. From supply-only solutions to full design and...