Phase 2 of £29m refurbishment gets underway

Housing Wed, Mar 23, 2016 9:09 AM

Phase 2 of £29m refurbishment gets underway

The second phase of Metropolitan’s ambitious five-year refurbishment of the Ashmole Estate, adjacent to the Oval cricket ground in Lambeth, is underway.

Phase 2 will see a further range of improvements to homes on the 700-property estate including the replacement of kitchens and bathrooms; the installation of new boilers and radiators; re-roofing; and brickwork repairs to blocks of flats.

The overall aim of the project is to revamp the estate and create modern, warm and more energy-efficient homes for the future.

Improvements made during Phase 1 included upgrades to building exteriors; the refurbishment of a sheltered club house for the over-50s; and communal area enhancements, such as a new multi-use family recreation area called the ‘Jelly Park.’

The Ashmole project, due for completion in 2016, incorporates a variety of works to reduce carbon emissions including: external wall insulation; double glazing; and energy-efficient heating and hot water systems, including modern communal boilers.  As a result, assessors predict a reduction in annual CO2 emissions of between 1.9 and 5.2 tonnes per unit, depending on the property type and its location on the estate.

A range of community initiatives are also in place, including a highly successful employment scheme providing training and support for local people on or near the estate. The site-based construction training programme ‘Live Train’ is funded by Metropolitan and construction partner Rydon, and has so far secured full-time employment for 24 people.

Richard Vining, Metropolitan’s Executive Director of Development, said: “The start of Phase 2 is a key milestone in the work we are doing with our partners at Ashmole. We are confident that this regeneration will deliver a vast improvement for residents and play a major role in creating local employment and community opportunities.”

Jovan Trkulja, Chair of the Ashmole Regeneration Board, and a resident, said: “I think Phase 1 went very well. The estate looks a lot better and more inviting now as a result of both the structural and landscaping improvements made so far. Residents feel warmer in their homes thanks to better insulation and we have useful recreational spaces in the form of the Jelly Park for children and families, and the refurbished club house for older residents.

“It’s early days for Phase 2 but work is underway and people on the estate are looking forward to the upgrades and improvements that will be made to their homes.”

Oval Councillor Jack Hopkins, who is also an Ashmole resident, said: "I'm really glad we are getting on with Phase 2. The Ashmole Regeneration Board was a positive forum for bringing challenges and the experiences of residents to Metropolitan and was constructive. I am confident the second phase will go even more smoothly."

Steve Blake, Refurbishment Director of Rydon Maintenance, added: “We are committed to continuing the positive change to the Ashmole Estate and the surrounding community, providing better, more efficient homes and employment opportunities in our industry. This is a great example of regeneration in Lambeth delivering benefits for generations to come.”

Featured News

Specification news
Beko Appliance Partners promote a circular approach,...

Beko Appliance Partners, the dedicated contract division of Beko plc, who exclusively...

Read More >>

Specification news
Report calls for developers to do more to provide...

Slough and Aberdeenshire councils are the local authorities to have made the biggest...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

FRAMESAFE FR A2 FIRE RATED EXTERNAL WALL BREATHER MEMBRANE  Brochure

FRAMESAFE FR A2 FIRE...
By Glidevale Protect

Download Now >>

A Guide to Aluminium Fencing Brochure

A Guide to Aluminium...
By F.H. Brundle

Download Now >>

Handrailing & Balustrade Systems Brochure

Handrailing & Balust...
By F.H. Brundle

Download Now >>

RLG600 Access Flooring System Brochure

RLG600 Access Floori...
By Kingspan Data & Floo...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Straightcurve®
Straightcurve®

Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...

Read More >>

RLG600 Access Flooring System
RLG600 Access Flooring System

The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...

Read More >>

RHG600 Simploc
RHG600 Simploc

Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Straightcurve® Product Range Overview - A Demonstration of Installation Ease
Straightcurve® Product Range Overview - A Demonstration of Installation Ease

Straightcurve® Product Range Overview - A Demonstration of Installation Ease

Watch Now >>

Forma aluminium column casings for Winchester College
Forma aluminium column casings for Winchester College

In progressive and dynamic business sectors, such as construction, it’s natural to be forward...

Watch Now >>

Decorative metal bulkheads & column casings for Tesco Extra, Birmingham
Decorative metal bulkheads & column casings for Tesco Extra, Birmingham

Decorative aluminium horizontal bulkheads more than 100 metres long have been supplied and installed...

Watch Now >>