New Year brings increased confidence for architects

Hotel, Sport & Leisure Wed, Mar 23, 2016 9:26 AM

New Year brings increased confidence for architects

The RIBA Future Trends Workload Index bounced back strongly in January 2016, rising to +29 (up from +15 in December 2015).

Increased workload optimism was shown across most of the UK, with the South of England (balance figure +38) showing particular strength and only Scotland (balance figure –25) in negative territory.

Large practices (51+ staff) remain the most positive about future prospects (balance figure +50); small practices (1–10 staff, balance figure +29) and medium-sized practices (11–50 staff, balance figure +25) similarly expect workloads to increase over the next three months.

Private housing continues to be the primary growth area for the profession, with the sector forecast rising to +30 (up from +20 in December 2015). The commercial sector workload forecast increased to +14 in January (up from +9 in December). The public sector workload forecast also saw a healthy uplift, standing at +7 in January (up from +1 in December). The community sector forecast has not yet found positive ground, standing at zero.

In this quarter, practices indicated that the rate of workload growth has slowed compared with the same quarter 12 months ago but remains healthy at an annual rate of 3%.

The RIBA Future Trends Staffing Index rose slightly this month, standing at +10 in January 2016 (from +9 in December 2015). Medium-sized practices were the most positive about future staffing levels, reaching a balance figure of +31, compared with large practices and small practices (balance figures of +25 and +8 respectively).

Practices indicated that they are now employing 3% more staff than they were in January 2015, suggesting a buoyant employment market for salaried architects. Only 2% of practices expect to have fewer staff three months from now.

RIBA Executive Director Members Adrian Dobson said: “As we entered the New Year confidence seems to have been renewed somewhat, with a number of our practices reporting an increase in enquiries in that month.  

“The RIBA Future Trends survey commenced seven years ago, and from January 2009 to January 2013 it consistently recorded decreases in the overall value of architectural work in progress. However, we have now seen eleven quarters of continual workload growth, which despite some cooling off in its rate is nevertheless still a healthy 3% per annum.

“We continue to receive feedback on issues that impact practices, including difficulties in ensuring prompt payment of fees, the complexities of public procurement processes, and slow performance by some local planning authorities. Whilst a small number of practices have reported recruitment difficulties there does not yet appear to be a clear skills shortage.”

Featured News

Specification news
Three considerations for hotel, gym and leisure...

Specifying shower and wetroom drainage in hotel, gym and leisure facilities requires...

Read More >>

Specification news
Compass Pools: Specifying High-Yield Aquatic...

This content is a sponsored publication provided by Compass Pools, an award-winning...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

2026 Product Brochure Brochure

2026 Product Brochur...
By ​The Radiator Compan...

Download Now >>

System for Laying Floor and Wall Coverings Brochure

System for Laying Fl...
By FassaFloor

Download Now >>

Training for Excellence Brochure

Training for Excelle...
By Aico

Download Now >>

The Connected Home Solution Brochure

The Connected Home S...
By Aico

Download Now >>

Safety First, Aico First Brochure

Safety First, Aico F...
By Aico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Glass Partition Walls
Glass Partition Walls

Partition wall systems made of glass allow transparent room partition. They open, divide and...

Read More >>

FASSAFILL MEDIUM
FASSAFILL MEDIUM

Water repellent cement-based sealant for grouting joints from 2 to 12 mm, resistant to mould and...

Read More >>

FASSA AQUAZIP FAST
FASSA AQUAZIP FAST

Two-component elastic cement membrane, quick drying even at low temperatures, for waterproofing and...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

DAB EsyBox Pop | Compact booster pump for perfect home water pressure
DAB EsyBox Pop | Compact booster pump for perfect home water pressure

Struggling with weak showers and inconsistent flow? The DAB EsyBox Pop is the revolutionary,...

Watch Now >>

Marsh Industries - Phos-Lite
Marsh Industries - Phos-Lite

Marsh Industries - Phos-Lite

Watch Now >>

Marsh Industries - Nutra-Lite
Marsh Industries - Nutra-Lite

Marsh Industries - Nutra-Lite

Watch Now >>