MSPS marks the completion of sustainable school build

Education Wed, Mar 23, 2016 9:15 AM

MSPS marks the completion of sustainable school build

Robbie McKillop, public sector director at Morgan Sindall Professional Services (MSPS), the multidisciplinary design consultancy, attended the official ‘handover’ of Biggar Primary School to celebrate the completion of the sustainably-built primary school.

The school is now ready for teachers and pupils to move in.

Jim Thom, framework manager and Edward Carr, area director from Morgan Sindall plc, also attended the event as framework partners to South Lanarkshire Council.

MSPS provided mechanical and electrical services to the project, working closely with AHR Architects. Key to successful delivery was energy efficiency, ensuring environmental sustainability and reduced operating costs for the school.

Robbie McKillop says that sustainability, a key focus for MSPS, is particularly important in public sector design: “Design needs to consider the lifecycle of a building in order that long term budgets are used efficiently.  Our M&E design provides extensive natural ventilation, photovoltaic panels to provide the school with free electricity, LED lighting throughout and a high level of air tightness. This contributed to the school achieving the A-rated EPC (Energy Performance Certificate).”

Built over three floors, Biggar is one of the largest primary schools of the eight handed over in MSPS’ South Lanarkshire completed design portfolio. Other schools from the South Lanarkshire Council framework that MSPS are currently working on include Machanhill, Udston and Braidwood Primary schools.

Featured News

Specification news
New Junior School offers a lesson in modern building...

The new Junior School for the Girls Day School Trust Notting Hill & Ealing High...

Read More >>

Specification news
Collaboration and sustainability focus for Altro in...

BAM Construct UK has collaborated with Altro and Recofloor to achieve significant...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Proctors Spacetherm Building & Construction Brochure

Proctors Spacetherm...
By A Proctor Group Ltd.

Download Now >>

Proctors Proctor Passive Brochure

Proctors Proctor Pas...
By A Proctor Group Ltd.

Download Now >>

Proctors Air Brochure Brochure

Proctors Air Brochur...
By A Proctor Group Ltd.

Download Now >>

Proctors Modular & Offsite Solutions Brochure

Proctors Modular & O...
By A Proctor Group Ltd.

Download Now >>

Proctors Hamm Principles Brochure

Proctors Hamm Princi...
By A Proctor Group Ltd.

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

SOPRALENE FLAM 180 AF
SOPRALENE FLAM 180 AF

Membrane composed of elastomer modified bitumen and a non woven polyester reinforcement.The upper...

Read More >>

FLAGON SR DE PVC
FLAGON SR DE PVC

Membrane composed of flexible PVC and a polyester reinforcement. Available in different RAL...

Read More >>

FLAGON S PVC
FLAGON S PVC

Membrane composed of flexible PVC. Available in different RAL Colours.Used for detailing work. The...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>

Dining Area Canopy at John Spendluffe Technology College
Dining Area Canopy at John Spendluffe Technology College

We designed and installed a new dining area canopy for John Spendluffe Technology College. This has...

Watch Now >>