Important Changes Ahead for Construction Products

Housing Wed, Mar 23, 2016 10:26 AM

Important Changes Ahead for Construction Products

The Construction Products Regulation (CPR) will come into force on 1st July 2013, replacing the existing Construction Products Directive (CPD). From this date CE marking of construction products that are covered by a harmonised European standard (hEN) or European Technical Assessment (ETA), and for which a claim of performance is made, will become mandatory.  

The UK exercised its right to opt out from the existing Construction Products Directive (CPD), but cannot opt out from the CPR.

The introduction of the CPR will therefore have significant implications for any person or company manufacturing, importing or supplying construction products, including designers, purchasers, importers, inspection staff, quality managers and project managers.  It will also impact on specifiers and users of products, such as architects, contractors and sub-contractors.

To help industry managers understand the changes and responsibilities of the new regulation, Conformance Limited is running a comprehensive training session on the requirements of the new CPR.  The day-long course is on the 16th May 2013 in Buxton, Derbyshire, and will provide attendees with the information they need to ensure their products meet the new regulation.

Featured News

Specification news
Mapei delivers surface solution at The Cocoa Works

A Mapei resilient flooring system has been used to complete an extensive project at...

Read More >>

Specification news
The elegance of Paris balconies bring a modern touch...

Paris balconies, with their timeless charm and practicality, are becoming something...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Straightcurve®
Straightcurve®

Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...

Read More >>

RLG600 Access Flooring System
RLG600 Access Flooring System

The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...

Read More >>

RHG600 Simploc
RHG600 Simploc

Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Specification Insights with Majestic London Showers
Specification Insights with Majestic London Showers

Specification Insights with Majestic London Showers

Watch Now >>

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>