Hundreds of thousands of homes with planning permission waiting to be built

Housing Wed, Mar 23, 2016 10:40 AM

Hundreds of thousands of homes with planning permission waiting to be built

New research reveals there are a record 475,647 homes in England which have been given planning permission but have yet to be built.

The study, commissioned by the Local Government Association and carried out by industry experts Glenigan, shows this bumper backlog has grown at a rapid pace over the past few years.

In 2012/13, the total of unimplemented planning permissions was 381,390 and in 2013/14 it was 443,265.

The LGA said that the figures underline the need for councils to be able to invest in building more homes and also for the skills shortage affecting the construction industry to be addressed.

Council leaders also want powers to charge developers full council tax for every unbuilt development from the point that the original planning permission expires.

The LGA, which represents more than 370 councils in England and Wales, also said:

  • Developers are taking longer to complete work on site. It now takes 32 months, on average, from sites receiving planning permission to building work being completed – 12 months longer than in 2007/8.
  • The number of planning applications being granted planning permission in 2014/15 was 212,468 - this is up from 187,605 in 2007/08 and is higher than all previous years.
  • Councils still approve nine in every 10 applications.
  • While the construction industry's forecasted annual recruitment need is up 54 per cent from 2013, there are 10,000 fewer construction qualifications being awarded by colleges, apprenticeships and universities.
  • There were 58 per cent fewer completed construction apprenticeships last year than in 2009.

Cllr Peter Box, LGA Housing spokesman, said: “These figures conclusively prove that the planning system is not a barrier to house building. In fact the opposite is true, councils are approving almost half a million more houses than are being built, and this gap is increasing.

“While private developers have a key role in solving our chronic housing shortage, they cannot build the 230,000 needed each year on their own. To tackle the new homes backlog and to get Britain building again, councils must have the power to invest in building new homes and to force developers to build homes more quickly.

“Skills is the greatest barrier to building, not planning. If we are to see the homes desperately needed across the country built and jobs and apprenticeships created, councils must be given a leading role to tackle our growing construction skills shortage, which the industry says is one of the greatest barriers to building.

“Devolving careers advice, post-16 and adult skills budgets and powers to local areas would allow councils, schools, colleges and employers to work together to help unemployed residents and young people develop the vital skills to build.

“New homes are badly-needed and councils want to get on with the job of building them. If we are to see a genuine end to our housing crisis we have to be given the powers to get on with it.”

Featured News

Specification news
Why M&E complexity is pushing high-rise delivery...

As UK multi-residential buildings grow taller, larger, and more technically complex,...

Read More >>

Specification news
Accelerating the Delivery of Ultra-low Energy Homes

Offsite housing specialist TALO has expanded its package of solutions to accelerate...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

2026 Product Brochure Brochure

2026 Product Brochur...
By ​The Radiator Compan...

Download Now >>

System for Laying Floor and Wall Coverings Brochure

System for Laying Fl...
By FassaFloor

Download Now >>

Training for Excellence Brochure

Training for Excelle...
By Aico

Download Now >>

The Connected Home Solution Brochure

The Connected Home S...
By Aico

Download Now >>

Safety First, Aico First Brochure

Safety First, Aico F...
By Aico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Glass Partition Walls
Glass Partition Walls

Partition wall systems made of glass allow transparent room partition. They open, divide and...

Read More >>

FASSAFILL MEDIUM
FASSAFILL MEDIUM

Water repellent cement-based sealant for grouting joints from 2 to 12 mm, resistant to mould and...

Read More >>

FASSA AQUAZIP FAST
FASSA AQUAZIP FAST

Two-component elastic cement membrane, quick drying even at low temperatures, for waterproofing and...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

DAB EsyBox Pop | Compact booster pump for perfect home water pressure
DAB EsyBox Pop | Compact booster pump for perfect home water pressure

Struggling with weak showers and inconsistent flow? The DAB EsyBox Pop is the revolutionary,...

Watch Now >>

Marsh Industries - Phos-Lite
Marsh Industries - Phos-Lite

Marsh Industries - Phos-Lite

Watch Now >>

Marsh Industries - Nutra-Lite
Marsh Industries - Nutra-Lite

Marsh Industries - Nutra-Lite

Watch Now >>