CMS delivers for new Scottish facility

Regeneration Wed, Mar 23, 2016 9:26 AM

CMS delivers for new Scottish facility

CMS Window Systems has played a key role in the manufacture and installation of thermally-efficient curtain walling, windows and doors for Emerson Process Management’s new facility at the new D2 business park, Aberdeen.

Emerson is one of the world’s foremost names in engineering services across a wide range of industrial and commercial markets, and places high value on the efficiency and integrity of its staff, operations and facilities.

Efficiency, therefore, was a high priority when Emerson Process Management – a branch of the company which focuses on developing problem-solving technologies and services for industrial businesses – acquired a site at the D2 business park in Dyce, Aberdeen to support its work with the North Sea oil and gas industry.

CMS was appointed by main contractor Bowmer & Kirkland to design, manufacture and install curtain walling, windows and doors for the facility. The £20 million development, built to replace Emerson’s existing Aberdeen headquarters in nearby Kirkhill, comprises 2,600 m2 of office space, as well as a 3,065m2 service centre with meeting facilities and a customer collaboration suite, and can accommodate up to 200 Emerson personnel.

Reflecting this code of efficiency, the facility adheres to exacting thermal performance standards and complying with the latest requirements of current building regulations. With site development overseen by Miller and construction completed by Bowmer & Kirkland, work on Emerson’s new Aberdeen premises began in June 2014, with CMS joining the project in February 2015.

The solutions delivered by CMS were chosen to enhance the efficiency of the building’s envelope, reducing heat transfer while allowing the entry of natural light. Aluminium curtain walling created using Metal Technology’s System 17 ensures the building adheres to exacting thermal performance standards. With a continuous thermal isolator providing a thermal break throughout the system, as well as 6mm toughened Planitherm Ultra N glass used in conjunction with 16mm Swisspacer V warm edge spacer, the system is compliant with the latest thermal requirements of current building regulations.

Since planning consent was granted in 2012, D2 has become one of the biggest mixed use developments in Scotland for many years, aiming to support industry in the area with its versatile premises and convenient transport links. Emerson’s cutting-edge new site on the park forms part of this; Stuart Brown, General Manager of Emerson Process Management UK and Ireland, said: “[c]onsolidating three existing facilities in the Dyce area into a single leading-edge building close to the Aberdeen airport demonstrates Emerson’s commitment to support our Scotland and North Sea customers.”

The D2 development has also achieved wider recognition at the tail end of 2015 as it has been named as a finalist for the Architectural Excellence Award (Commercial Buildings) in the 2016 Scottish Property Awards.

Featured News

Specification news
Swisspearl Carat – iconic in all its facets

Swisspearl Carat is the timelessly beautiful and internationally acclaimed classic in...

Read More >>

Specification news
Hunter Douglas replaces its decades-old original...

Hunter Douglas Architectural was called on to supply a replacement ceiling at a Grade...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

ACO Blue Roof Guide – Vol 2 Brochure

ACO Blue Roof Guide...
By ACO Building Drainag...

Download Now >>

Stannah Commercial Brochure Brochure

Stannah Commercial B...
By Stannah Group

Download Now >>

Stannah Midilift CLS Brochure

Stannah Midilift CLS
By Stannah Group

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Go
Go

OverviewGo is fast to fit, quick to configure and easy to use without compromising on safety.Packing...

Read More >>

SmokeGo
SmokeGo

OverviewSmokeControl gives you complete and active smoke control from your fire system – without...

Read More >>

AdSpecials
AdSpecials

OverviewIf you have a complex fire safety challenge, our AdSpecials team will help you solve...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

The UK's No 1 Pool, Spa and Wellness Show – SPATEX 30 secs
The UK's No 1 Pool, Spa and Wellness Show – SPATEX 30 secs

And there’s a chance to do it all over again when the BIG 30th anniversary edition of SPATEX 2026...

Watch Now >>

Reclaimed Brick Company Leah's Yard Square Sheffield
Reclaimed Brick Company Leah's Yard Square Sheffield

Reclaimed Brick Company is part of Leah's Yard Square in Sheffield, a historic site revitalised for...

Watch Now >>

Day in the life of a Reclamation Yard
Day in the life of a Reclamation Yard

A typical day at a reclamation yard is filled with activity and discovery. Early mornings often...

Watch Now >>