Barr Construction installs 106m roof truss at Ashton Gate rebuild

Hotel, Sport & Leisure Wed, Mar 23, 2016 9:11 AM

Barr Construction installs 106m roof truss at Ashton Gate rebuild

Leading UK construction firm Barr Construction took a big stride forward with the Ashton Gate rebuild successfully lifting the 106m Dolman Stand roof truss into place.

Weighing 75 tonnes, the roof extension was built at ground level over the past few weeks before two 200 tonnes cranes were used to lift the steel truss into place.

The lifting of the roof truss is one of the most complicated part of the £45 million rebuild of Bristol City and Bristol Rugby’s ground to-date.

Mike Henderson, operations manager for Barr Construction said: “Today has been a landmark event. The design has had to take in a lot of difficult parameters. From working with the existing Dolman roof to the new South Stand, we’ve had to work to tight tolerances of 10mm at each end of the truss.  

“When you consider that it is 106 metres long and weighs 75 tonnes it’s not an easy piece of steel to slot in to place, but it was a momentous occasion to see that it has today.”

Bristol Sport chairman, Martin Griffiths said: “It’s been a big week for the stadium. Last Wednesday we saw the gap close in the South Stand and seating being fitted, today the lift of the Dolman roof truss. It was quite an incredible feat of engineering to see it slot seamlessly into place.  

“Fans coming to this weekend’s games at Ashton Gate will really start to get a sense of what this stadium is going to become.”

Barr construction has been on site since July last year. Phase One consisted of the demolition and rebuild of the South Stand with Phase Two seeing the Dolman Stand remodelled to include an extended roof and new lower tier.  

Phase Three will start this summer and see the Williams stand demolished and replaced with a two-tier stand that will hold 11,000 people.

Featured News

Specification news
Setting the standard for large-scale solid surface...

In the demanding world of commercial construction and renovation, where deadlines are...

Read More >>

Specification news
Hotel specifies Dorma Huppe moveable walls

Partitioning expert, Style was recently contracted to work with architects, Jestico &...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Vertical radiators complete range Brochure

Vertical radiators c...
By Myson

Download Now >>

Myson Radiant Heating Premium underfloor heating systems Brochure

Myson Radiant Heatin...
By Myson

Download Now >>

Which heat emitter is the right one? Brochure

Which heat emitter i...
By Myson

Download Now >>

Sustainable heating solutions for renovation Brochure

Sustainable heating...
By Myson

Download Now >>

Rearo Tradeline Brochure

Rearo Tradeline
By Rearo

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

DUOFLEX
DUOFLEX

DUOFLEX is a high quality elastomeric bitumen, hot bonded to the substrate incorporating the fleece...

Read More >>

TECSOUND
TECSOUND

TECSOUND is a polymer based, bitumen-free, high-density synthetic membrane. The combination of its...

Read More >>

ISOLAIR MULTI
ISOLAIR MULTI

ISOLAIR MULTI is a natural and ecological vapour-permeable, windproof and water-repellent thermal...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Our SUSTAINABILITY Roadmap
Our SUSTAINABILITY Roadmap

Myson has a clear sustainability strategy in line with the UN Sustainable Development Goals (SDGs)...

Watch Now >>

Sustainable Energy Efficient Solutions
Sustainable Energy Efficient Solutions

From radiators and underfloor heating to ceiling convectors and towel warmers, Myson is the UK’s...

Watch Now >>

UNISENZA PLUS Smart Controls_The complete system solution
UNISENZA PLUS Smart Controls_The complete system solution

With Unisenza Plus Smart Controls you can easily monitor and control all linked heating products via...

Watch Now >>