Exhibition & Webinar Tue, Mar 22, 2016 5:30 PM
New from Windhager at Ecobuild 2014 will be its latest development BioWIN 2.
The BioWin 2 has been designed to be a ‘space conscious’ appliance and can be installed within an alcove as it requires no servicing clearances either to the left, right or the rear and minimal clearance to the front.
All cleaning and servicing is achieved from the front of the BioWin 2 – no other wood pellet boiler achieves these minimum clearances making it a real innovation and ideal for many different properties.
BioWin 2 is available in 4 outputs from 10 to 26kW all with a 30% modulation range for maximum efficiency. The boilers come with a host of innovative features. There is fully automated cleaning and ash removal to an integrated ash container ensuring full efficiency and long intervals between cleaning and servicing. A patented sliding grate within the burner bowl and close monitoring of the combustion guarantee maximum combustion efficiencies.
The new boiler is available as a hand feed version from its integrated pellet hopper or as an auto feed boiler from a bulk pellet store. Thanks to Windhager’s pellet suction feed system, it can be installed up to 25 metres from the boiler making for very flexible installation.
Featured News
The popular Alumasc WMS CPD webinars is back for round two, the next topic is on...
Alumasc WMS have a new addition to its family of ‘Rain to Drain’ CPD’s....
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
Proctors Spacetherm...
By A Proctor Group Ltd.
Proctors Proctor Pas...
By A Proctor Group Ltd.
Proctors Air Brochur...
By A Proctor Group Ltd.
Proctors Modular & O...
By A Proctor Group Ltd.
Proctors Hamm Princi...
By A Proctor Group Ltd.
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Membrane composed of elastomer modified bitumen and a non woven polyester reinforcement.The upper...
Membrane composed of flexible PVC and a polyester reinforcement. Available in different RAL...
Membrane composed of flexible PVC. Available in different RAL Colours.Used for detailing work. The...
CONSTRUCTION VIDEOS - LATEST VIDEOS
https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....
A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...
We designed and installed a new dining area canopy for John Spendluffe Technology College. This has...