Transformation work begins for iconic stadium on Queen Elizabeth Olympic Park

Hotel, Sport & Leisure Tue, Mar 22, 2016 5:21 PM

Transformation work begins for iconic stadium on Queen Elizabeth Olympic Park

Work to transform the Stadium in Queen Elizabeth Olympic Park into a year round multi-use venue to deliver a permanent sporting, cultural and community legacy in east London has begun.

In contracts worth over £67m, London Legacy Development Corporation on behalf of the E20 Stadium LLP has started the work through contractor Carey’s PLC, who began removing 25,000 seats and the grass field of play to prepare the ground for Balfour Beatty Group Ltd to start taking down the existing roof later in the autumn.

A new roof – twice the size of the original at around 45,000sq metres – will then be built and lifted into position by spring 2015. It will cover every seat in the ground and improve the acoustics and spectator experience for football matches, other sporting events and concerts.

Work to erect the new roof will be completed by spring 2015 when final preparations for the Rugby World Cup will take place including installing concessions, toilets, turnstiles, hospitality areas and laying the pitch for the five World Cup matches that will take place at the Stadium between September and October 2015.  

Following the Rugby World Cup, final work will be carried out to prepare the Stadium for its long term tenants West Ham United FC and UK Athletics.

New retractable seating will be installed so the lower bowl can be protracted and retracted  depending on the type of event taking place; this allows closer pitch side football views while retaining an international class running track. These will be in place ahead of the start of the football season, domestic athletics championships and Diamond League events taking place in the summer of 2016.

Mayor of London Boris Johnson said: “Work is now underway to transform London’s stunning Olympic Stadium ensuring its long term use as a world class venue. The now iconic stadium will be converted and a new roof added to enable it to host a wide variety of sporting and cultural events. These construction works are creating valuable jobs and underlining the progress being made to deliver a legacy from the 2012 Games in east London.”

London Legacy Development Corporation Chief Executive Dennis Hone said: "These works will ensure the Stadium will be a flexible venue used throughout the year, delivering a truly lasting legacy in east London. From the lighting of the cauldron to 2012 stars like Mo Farah, Hannah Cockcroft and Usain Bolt storming to victory, this iconic Stadium holds some special memories.  Today paves the way for the Stadium’s next chapter and I am sure it will host many more inspirational moments over the decades to come”

Kim Bromley-Derry, Chief Executive of Newham Council, said: “By 2015, the Stadium will be a game-changer in every sense. It will be a venue capable of changing for a range of sporting and cultural events.

"No previous Olympic Stadium has ever done this – or proved its legacy credentials so quickly.  This exciting transformation will generate jobs for our local community at each stage of the project. Residents will be able to develop their skills while creating a brilliant asset for their area.

"The fact that everyone in Newham will be able to use the new Stadium will bring to reality the commitment we made in the original bid to host the Olympic Games to create a lasting legacy.”

Featured News

Specification news
Knauf Insulation’s sustainability credentials hit the...

Manchester is known for its rich cultural heritage, but now Co-op Live, the UK’s...

Read More >>

Specification news
Gatic Ultraslot meets rigorous drainage demands at...

The new Jorge Chávez Airport in Peru is one of the most pioneering airport projects...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Vertical radiators complete range Brochure

Vertical radiators c...
By Myson

Download Now >>

Myson Radiant Heating Premium underfloor heating systems Brochure

Myson Radiant Heatin...
By Myson

Download Now >>

Which heat emitter is the right one? Brochure

Which heat emitter i...
By Myson

Download Now >>

Sustainable heating solutions for renovation Brochure

Sustainable heating...
By Myson

Download Now >>

Rearo Tradeline Brochure

Rearo Tradeline
By Rearo

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

DUOFLEX
DUOFLEX

DUOFLEX is a high quality elastomeric bitumen, hot bonded to the substrate incorporating the fleece...

Read More >>

TECSOUND
TECSOUND

TECSOUND is a polymer based, bitumen-free, high-density synthetic membrane. The combination of its...

Read More >>

ISOLAIR MULTI
ISOLAIR MULTI

ISOLAIR MULTI is a natural and ecological vapour-permeable, windproof and water-repellent thermal...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Our SUSTAINABILITY Roadmap
Our SUSTAINABILITY Roadmap

Myson has a clear sustainability strategy in line with the UN Sustainable Development Goals (SDGs)...

Watch Now >>

Sustainable Energy Efficient Solutions
Sustainable Energy Efficient Solutions

From radiators and underfloor heating to ceiling convectors and towel warmers, Myson is the UK’s...

Watch Now >>

UNISENZA PLUS Smart Controls_The complete system solution
UNISENZA PLUS Smart Controls_The complete system solution

With Unisenza Plus Smart Controls you can easily monitor and control all linked heating products via...

Watch Now >>