Public Sector Tue, Mar 22, 2016 5:04 PM
Thru-Wall’s innovative and integrated modular offsite approach has ensured that the new £38 million Manchester Creative and Media Academy opened on time for the 2012 academic year.
It was the advantages that Thru-Wall could offer on both design and cost that secured this contract against more traditional build solutions for the complete wall facade.
Manufactured offsite at a state-of-the-art facility in Merseyside, the structural insulated panels were then delivered to site and were installed within just 10 days. A fabricated aluminium rainscreen solution that boasts six separate colour finishes to achieve the architect’s external visual effect was then installed in January.
The academy has two four-storey buildings that are able to house 1500 students, as well as providing accommodation for 120 post-16 education students.
Set in 110,000m2, the site of the new academy features large, clear spaces, both inside and out, with a courtyard that will host outdoor events during the summer and will enable students to have the space to imagine, work and create.
Featured News
Senior Architectural Systems has joined forces with supply chain partner WD Group to...
Taylor Lane’s Classic wall system has been used to construct 22 dwellings at Burcot...
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
DUOFLEX is a high quality elastomeric bitumen, hot bonded to the substrate incorporating the fleece...
TECSOUND is a polymer based, bitumen-free, high-density synthetic membrane. The combination of its...
ISOLAIR MULTI is a natural and ecological vapour-permeable, windproof and water-repellent thermal...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Myson has a clear sustainability strategy in line with the UN Sustainable Development Goals (SDGs)...
From radiators and underfloor heating to ceiling convectors and towel warmers, Myson is the UK’s...
With Unisenza Plus Smart Controls you can easily monitor and control all linked heating products via...