Planning permission for science block extension kick-starts second phase of £25 million building improvement programme at King Edward’s School, Birmingham

Latest News Tue, Mar 22, 2016 4:59 PM

Planning permission for science block extension kick-starts second phase of £25 million building improvement programme at  King Edward’s School, Birmingham

Planning permission has been granted for a science block extension at King Edward’s School, Birmingham, kicking off the second phase of a £25 million building improvement programme.

Partly funded by a £2.5 million donation from a former pupil, the new phase at the top independent boys’ school will include state-of-the-art teaching facilities for science and modern languages, as well as a new Sixth Form centre. The generous donation will enable an entirely new Modern Languages department and new laboratories to be built and reflects the school’s ongoing commitment to science and languages.

Due to start in the summer, the programme will be delivered by civil and structural engineering consultants, Thomasons; architects, BDP; project managers, Synergy and services engineer, Couch Perry & Wilkes.

As well as providing surveys for the planning application, Thomasons will be responsible for the structural elements of the project. David Sharpe, structural engineer at Thomasons, said: “After having opened the Birmingham office just over a year ago, we are thrilled to be able to bring our engineering expertise to such a significant local project. King Edward’s School, Birmingham is not only highly regarded locally, but it is consistently one of the top schools in the country.”

Svetlana Solomonova, architect at BDP added: “This is an exciting project to work on, both in terms of satisfying the school’s aspirations and ensuring that the modern extension fits comfortably within the school’s existing masterplan. The new accommodation creates a well-linked courtyard that adds valuable outdoor teaching space for the science department for a very modest investment”

The second phase, which follows the development of the Sir Paul and Lady Ruddock Performing Arts Centre, will involve the removal of the existing physics laboratory block and the creation of an L-shaped teaching space that will be wrapped around the southern side of the courtyard. This will replace single storey classrooms with facilities over two storeys to maximize the building’s footprint. Included in the project is the creation of a new Sixth Form centre, which will be built over an existing building on one side of the courtyard. Plans also include improving the connection between the science department and the main school building to enhance circulation and connectivity to the rest of the school.

John Claughton, the Chief Master at King Edward’s said: “We are engaged in a long-term programme to ensure that the school has the best possible facilities for all aspects of our education. These are very exciting times and these projects show the ambition we have to remain one of the great day schools of this country.”

Featured News

Specification news
Join the Arturo CPD Seminar: Elevate your expertise in...

Arturo CPD seminars offer an invaluable opportunity for architects and designers to...

Read More >>

Specification news
Government’s £39bn programme needs plan-led system...

The Royal Town Planning Institute (RTPI) has long advocated for increased funding for...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

HPS200 Ultra Case Study Brochure Brochure

HPS200 Ultra Case St...
By Tata Steel

Download Now >>

Confidex Datasheet Brochure

Confidex Datasheet
By Tata Steel

Download Now >>

Prisma UK 2024 Brochure

Prisma UK 2024
By Tata Steel

Download Now >>

HPS200 Ultra UK Brochure

HPS200 Ultra UK
By Tata Steel

Download Now >>

Amtico Bio Support Document  Brochure

Amtico Bio Support D...
By Amtico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

​The Confidex® Guarantee
​The Confidex® Guarantee

Offers the most comprehensive guarantee for pre-finished steel products in Europe and provides peace...

Read More >>

Colorcoat HPS200 Ultra®
Colorcoat HPS200 Ultra®

Colorcoat HPS200 Ultra®Super durable guaranteed performance.Designed to withstand even the most...

Read More >>

Prisma
Prisma

Colorcoat Prisma®Aesthetics that last, guaranteed.Colorcoat Prisma® demonstrates a step change by...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>