Spectators not the only fans at 2010 World Cup

Latest News Tue, Mar 22, 2016 4:54 PM

Spectators not the only fans at 2010 World Cup

A range of fans has been supplied by AMS (Air Movement Supplies), part of the Elta Group of companies, for a brand new iconic stadium which is to play host to the semi-final of the 2010 FIFA World Cup in South Africa.

The Moses Mabhida Stadium in Durban is one of several stadia purpose-built for the world’s biggest football tournament. Constructed on the grounds of the Kings Park Soccer Stadium, the new stadium will have a 70,000 spectator capacity during the World Cup, reducing to 54,000 as a multi-purpose venue once the tournament is over when a temporary third tier of seating will be removed. The three year build began back in 2006 and in June 2007 tenders were issued for the stadium’s ventilation contract. AMS, up against strong competition from other fan supply companies, won the tender and started working on site with ventilation contractor Improvair in May, 2008. The successful relationship already established with Improvair through other projects such as the prestigious Johannesburg International Airport, plus a capacity for speed of delivery for a project which was obviously so time critical, were significant factors in AMS winning the business.

A mix of smoke ventilation and axial fans (with silencers) were supplied for ventilation of the car parks and the plant room, with centrigual fans from the Kruger range installed as part of the stadium’s air conditioning system.

A central feature of the Moses Mabhida Stadium is an arch, somewhat reminiscent of the UK’s Wembley stadium. Rising some 106 metres above the pitch, the arch starts with two legs, becoming a single leg on the other side of the stadium, symbolising the unification of what was a formerly divided country. Spectacular views of the city and the ocean can be gained from a viewing platform at the apex of the arch, reached via a funicular system which carries visitors from the north side of the stadium.

Those brave enough can even take to the world’s largest swing, falling towards the pitch before swinging in a 220 metre arc. The construction of the stadium was completed on schedule on 24 November 2009, with the first match played a few days later, local team Maritzburg United beating Amazulu 1-0.

Commenting on the project, AMS Regional Manager, Murray Anderson said, “The eyes of the world will be firmly focused on South Africa in a few weeks time. Our workforce can take pride in the fact that they have helped to ensure that such an important and such a spectacular stadium was completed on time to host what I hope will be some memorable games of football.”

Featured News

Specification news
Education construction booms with strongest growth...

The UK education construction sector is at a pivotal moment, experiencing its...

Read More >>

Specification news
PM announces £200m investment to propel long term...

The National Wealth Fund will provide £200 million of investment to new...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Your high performance facade panel. With James Hardie, It’s Possible™ Brochure

Your high performanc...
By James Hardie

Download Now >>

James Hardie brings unique designs to life with beautiful fibre cement products that are built to last. It’s Possible™ Brochure

James Hardie brings...
By James Hardie

Download Now >>

fermacell® The Specification Guide Brochure

fermacell® The Speci...
By James Hardie

Download Now >>

Hardie backer fibre cement backerboard for Tile & Stone  Brochure

Hardie backer fibre...
By James Hardie

Download Now >>

RIVERSTONE® - DISCOVER NATURAL PHYLLITE Brochure

RIVERSTONE® - DISCOV...
By SSQ

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Senses White Fleck Kitchen Surfaces
Senses White Fleck Kitchen Surfaces

Senses Kitchen Surfaces. Beautifully Crafted, Effortlessly Maintained. The Senses range of...

Read More >>

SM 485: fast-setting, self-levelling smooth coat for interior floors
SM 485: fast-setting, self-levelling smooth coat for interior floors

FASSA's new SM 485: Your choice for a fast-setting, self-levelling smooth coat for interior floors,...

Read More >>

SL 416: A fast-setting, self-levelling smooth coat for interior floors
SL 416: A fast-setting, self-levelling smooth coat for interior floors

FASSA's new SL 416: A fast-setting, self-levelling smooth coat for interior floors. With superb...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Specification Insights with Majestic London Showers
Specification Insights with Majestic London Showers

Specification Insights with Majestic London Showers

Watch Now >>

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>