Schindler to equip China’s tallest building

Latest News Tue, Mar 22, 2016 5:28 PM

Schindler to equip China’s tallest building

Schindler China, the Chinese division of the Schindler Group, has been awarded a major contract for a 115-story megatall skyscraper currently under construction in Shenzhen, Guangdong province.  
 
When complete, Shenzhen’s Ping An Finance Center will include office and retail space and stand 660 meters high, making it the tallest building in China. The structure will feature Schindler’s 7000 high-rise series elevators and Schindler’s cutting-edge PORT transit management technology.

“This is one of the most exciting projects in Schindler’s history,” said Thomas Oetterli, member of the Group Executive Committee and overall responsible for the Group’s operations in China. “The Ping An Finance Center is the tallest building our company has ever had the chance to work on and we are very proud of being a part of this fascinating project."

This contract is the latest in a series of significant wins for Schindler in China, where the robust urbanization trend of recent years shows no signs of slowing down.

Commissioned by the Ping An Insurance Group, one of the largest insurance firms in China, the Ping An Finance Center will feature 33 Schindler 7000 series double-deck elevators. This high-rise optimized elevator model provides more efficient transportation and is the ideal choice for buildings with heavy traffic volume. Therefore, the Schindler 7000 again sets the standard for high-rise mobility in order to enable the construction of super skyscrapers.

The Ping An Finance Center will also benefit from Schindler’s leading technology for efficient transit management, PORT. By planning every occupant’s journey around the building and providing them with the means to reach their destinations quickly and easily, transit management optimizes the operation of the entire building with integrated access, guidance, transportation and security.

“It is an honor to have been chosen to participate in the creation of such a historic landmark,” declared Jackie Han, President of Schindler China. “Being involved from the beginning has allowed Schindler to play an integral role in the project planning, and we look forward to working together with the Ping An Group in a partnership of excellence in the years to come.”

The installation of the office elevator section started in December 2013, with a completion date of April 2015.

Featured News

Specification news
UK construction output continues to slide

Construction activity decreased for the fourth consecutive month as rising business...

Read More >>

Specification news
Digital Twin enhances building performance at Woodham...

A digital twin of Galliford Try’s newly-completed Woodham Academy project is...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

AKW Bathroom Catalogue 2025 Brochure

AKW Bathroom Catalog...
By AKW

Download Now >>

Baths Collection Brochure Brochure

Baths Collection Bro...
By AKW

Download Now >>

Your high performance facade panel. With James Hardie, It’s Possible™ Brochure

Your high performanc...
By James Hardie

Download Now >>

James Hardie brings unique designs to life with beautiful fibre cement products that are built to last. It’s Possible™ Brochure

James Hardie brings...
By James Hardie

Download Now >>

fermacell® The Specification Guide Brochure

fermacell® The Speci...
By James Hardie

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

SOPRALENE FLAM 180 AF
SOPRALENE FLAM 180 AF

Membrane composed of elastomer modified bitumen and a non woven polyester reinforcement.The upper...

Read More >>

FLAGON SR DE PVC
FLAGON SR DE PVC

Membrane composed of flexible PVC and a polyester reinforcement. Available in different RAL...

Read More >>

FLAGON S PVC
FLAGON S PVC

Membrane composed of flexible PVC. Available in different RAL Colours.Used for detailing work. The...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Specification Insights with Majestic London Showers
Specification Insights with Majestic London Showers

Specification Insights with Majestic London Showers

Watch Now >>

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>