Latest News Tue, Mar 22, 2016 4:55 PM
Smoke control systems are being implemented in all our new buildings to ensure safe exit for occupants in case of fire, what is little known is that many of our existing buildings are being refurbished and fitted with smoke control systems for safety and to reduce fabric damage in case of fire. Greenwich London Borough Council have recently called in SE Controls when they decided to upgrade Azile Everitt House, a 13 storey block of flats originally built in 1974. The project consists of retrofitting chain actuators to windows in common areas on all floors. Each bank of actuators is linked by a single cable back to a single ŒOsloop‚ control panel from SE Controls. Osloop control systems work on single cable connections which are small and easier to fit into an existing building. The Osloop system also offers actuator monitoring to determine actuator condition and correct operation, vital for maintenance of the system. Added to the system, the fire brigade requested that a repeater panel was installed at the entrance to the property giving the status of AOV‚s (Automatic Opening Vents). The installed system of Osloop controller and actuators offers a simple and highly effective solution for existing buildings to be fitted with a smoke control system. SE Controls are working closely with Greenwich London Borough Council on ensuring other buildings owned by the council are similarly protected. The Azile Everitt House project is expected to be completed in December 2010. SE Controls offer a complete service from design through to maintenance of Smoke and Natural Ventilation Control Systems for any building. More information on systems and services can be found at www.secontrols.com. To discuss a requirement with SE Controls, or request a copy of the printed literature, please call their head office in Lichfield on 01543 443060.
In association with SE Controls
Quick Links
Company Details
Featured News
Nakheel Mall, Dubai’s 435,000 sq.metre retail and lifestyle centre located in the...
Electricity House, Crest Nicholson Homes’ stylish city centre apartment development...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
Maintenance Solution...
By SE Controls
SE Cloudlink
By SE Controls
Product Specificatio...
By SE Controls
Corporate Overview
By SE Controls
Understanding Smoke...
By SE Controls
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
If the corridor extends to the external wall an AOV can be installed to remove smoke from the common...
The prime objective of a smoke control strategy is to keep the escape stair free from smoke, by...
If a prescribed and certified solution is not a viable option for the building design a fire...
CONSTRUCTION VIDEOS - LATEST VIDEOS
This video is an overview of the comprehensive range of solutions provided by SE Controls for...