Landlords given more time to protect deposits

Latest News Tue, Mar 22, 2016 4:59 PM

Landlords and letting agents are being given more time to protect their tenant’s deposits, but penalties for failing to protect will be more strictly enforced, under changes to the Localism Bill.

The changes, which will come into force from 6 April 2012, will give landlords and letting agents 30 days to protect their tenant’s deposit, an increase from the current 14 days.

The tenant must be provided with proof of the deposit protection and the Prescribed Information within this 30 day limit by the landlord or agent.

If the deposit isn’t protected, courts will be able to order the landlord or agent to pay the tenant between one and three times the deposit amount as penalty. They will also be unable to seek possession of the property using a Section 21 notice until the penalty is settled.

mydeposits will accept the late protection of deposits by landlords and agents after the 30 day period. However the tenant can still seek compensation even if the deposit is protected after the 30 day period, but before going to court. They can also make a claim after they have left the property.

Eddie Hooker, Chief Executive, mydeposits, said: “These changes to the Localism Bill will close a loophole which saw some landlords escape penalty, despite not protecting the deposit properly or protecting it late.
“It will help give tenants certainty that their deposit is being protected and strengthen penalties for those landlords who try to ignore their obligations.

“By using mydeposits, landlords and letting agents can be assured the deposit is protected as legally required and our Deposit Protection Certificate, along with the Information for Tenants leaflet, ensures our members provide their tenants with proof of this protection.”

To download a factsheet about the changes, visit http://www.mydeposits.co.uk/landlords/resources-and-guides/guides
For more information about my|deposits, visit www.mydeposits.co.uk or call 0844 980 0290.

Featured News

Specification news
UK construction output declines slightly in June

Construction companies indicated a marginal reduction in total business activity...

Read More >>

Specification news
INCA survey reveals size of the UK EWI industry

INCA, the recognised trade association for the external wall insulation (EWI)...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

HPS200 Ultra Case Study Brochure Brochure

HPS200 Ultra Case St...
By Tata Steel

Download Now >>

Confidex Datasheet Brochure

Confidex Datasheet
By Tata Steel

Download Now >>

Prisma UK 2024 Brochure

Prisma UK 2024
By Tata Steel

Download Now >>

HPS200 Ultra UK Brochure

HPS200 Ultra UK
By Tata Steel

Download Now >>

Amtico Bio Support Document  Brochure

Amtico Bio Support D...
By Amtico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

​The Confidex® Guarantee
​The Confidex® Guarantee

Offers the most comprehensive guarantee for pre-finished steel products in Europe and provides peace...

Read More >>

Colorcoat HPS200 Ultra®
Colorcoat HPS200 Ultra®

Colorcoat HPS200 Ultra®Super durable guaranteed performance.Designed to withstand even the most...

Read More >>

Prisma
Prisma

Colorcoat Prisma®Aesthetics that last, guaranteed.Colorcoat Prisma® demonstrates a step change by...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>