Latest News Tue, Mar 22, 2016 4:58 PM
Unitised curtain walling from leading architectural aluminium systems supplier Kawneer has helped in one of the most important restoration projects of a historic London square since World War II. Kawneer’s AA®201 modular or off-site curtain walling features on phase 2 of architects Kohn Pederson Fox Associates’ masterplan for new student accommodation at Imperial College’s Princes Gardens site (www.kawneer.co.uk/pr/ic) in the Knightsbridge Conservation Area of South Kensington. The Eastside phase had to be ready for occupation in the new academic year to avoid the cost of another year of temporary student accommodation but initial advice sought by the college indicated that completion would take three academic years. However, this was compressed to two years, and eventually completed three weeks ahead of schedule despite planning approval taking six months longer than expected, by maximising prefabrication in bathrooms, facades and virtually all elements of the structural frame. The previous 1960s student residences on the south and east sides of Princes Gardens were substandard and out of keeping with their garden square setting. It was important to the college that the new building was of a listable quality and restored the Victorian square’s original grandeur. KPF’s approach was to create a master plan that restored the original scale and coherence of the square. The solution demonstrated that more rooms of a higher standard could be provided in a building whose architecture and massing would heal the important public space. The townscape benefits of the design, which involved members of the Student Union, persuaded English Heritage and the City of Westminster to support the plan which is now considered one of the most important restoration projects of a historic London square since the Second World War. KPF said: “Eastside is not a pastiche of the old but is undoubtedly modern. By respecting the original colour palette and cleverly using façade panels, the scale and proportions of the original 1840s buildings have been continued and the integrity of the square re-established. In addition, the rear elevation, with its domestic scale brickwork, stucco and metalwork detailing, respects the facing terraced and mews houses.” Kawneer’s AA®201 unitised curtain walling, which can typically be installed by a team of five at the rate of 250m² a day and was detailed for this project by the company’s global special projects team, features on the rear elevation.
Featured News
In the evolving landscape of construction, reclaimed bricks offer a compelling fusion...
Following The Times’ recent coverage on jobs most and least at risk from...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
ACO Blue Roof Guide...
By ACO Building Drainag...
Stannah Commercial B...
By Stannah Group
Levelmaster
By Stannah Group
Trolleylift
By Stannah Group
Stannah Midilift CLS
By Stannah Group
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Comprehensive range of veneered and painted internal doorsets.SpecificationPuraDor is our most...
Decorative Salvage Embrace the charm of the past with our Decorative Salvage collection. This...
Roofing Materials Browse our carefully curated collection of reclaimed roof tiles and slates, ideal...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Reclaimed Brick Company is part of Leah's Yard Square in Sheffield, a historic site revitalised for...
A typical day at a reclamation yard is filled with activity and discovery. Early mornings often...
Reclaimed Brick Display at Reclamation Yard