HS2 jobs and growth boost for Birmingham

Latest News Tue, Mar 22, 2016 5:36 PM

HS2 jobs and growth boost for Birmingham

Transport Secretary Patrick McLoughin has been in Birmingham to welcome news about HS2 developments that will bring jobs and growth to the city.

Patrick McLoughin and HS2 Ltd chairman David Higgins met with Birmingham Council Leader Sir Albert Bore for the launch of the city’s Urban Regeneration Company tasked with helping maximise the benefits of HS2 for the area.

They also announced Birmingham as the location of the HS2 construction headquarters (HQ), creating 1,500 jobs.

The combined effect will be significant regeneration and a massive economic boost to the city.

Transport Secretary Patrick McLoughlin said: "HS2 is a vital part of our long-term economic plan. By locating the new HS2 engineering HQ in Birmingham we are bringing skilled job opportunities into the area, spreading HS2’s benefits beyond those using the new rail line.

"It is great news that Birmingham City Council has created a company specifically to focus on the regeneration opportunities created by HS2. It will bring new investment and work into the city, helping secure the future prosperity of the region and the country."

HS2 Chairman, David Higgins said: "The lasting impact of HS2 will, in the end, be determined by how successfully local authorities and regions use it as a catalyst to transform and develop not just their economies, but also the look and feel of the areas it touches. The Birmingham Curzon Urban Regeneration Company will, therefore, be hugely important both for Birmingham and the rest of the West Midlands, and also as an example to the rest of the cities along the route. I acknowledge and applaud the work that has gone on to get this far and wish it every success in the future."

The new Birmingham-based construction HQ will house up to 1,500 HS2 Ltd employees with the first part expected to open from 2015. Some employees will move their base from London to the new HQ but the majority will be brand new highly skilled jobs for the city. These will include the engineers and designers responsible for detailed construction plans for the track, stations and signalling as well as the staff needed to support their work.

The Birmingham Curzon Urban Regeneration Company will lead redevelopment in the heart of the city centre, which will:

  • redevelop over 140 hectares of land
  • create 14,000 jobs
  • provide 600,000 square metres of new employment floorspace
  • provide space for 2,000 homes
  • contribute up to £1.3 billion a year to the local economy.

The establishment of the regeneration body represents a bold and new approach to driving local economic growth, in what is a major transfer of power away from central government.

To accelerate the regeneration of the Curzon Street site, the area’s Growth Deal, the agreement which sees central government funds allocated to local projects, provides a further £130 million and help to bring forward work to extend the Midland Metro. The planned extension will bring tram services into the heart of the Birmingham Curzon area and link the HS2 terminus directly into the local transport system.

Featured News

Specification news
One in three would object to new energy infrastructure...

People objecting to new energy infrastructure being built near homes are unlikely to...

Read More >>

Specification news
Shortlist for the BREEAM Awards 2025

BRE has announced the shortlist for its 2025 BREEAM Awards – a celebration of the...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

AKW Bathroom Catalogue 2025 Brochure

AKW Bathroom Catalog...
By AKW

Download Now >>

Baths Collection Brochure Brochure

Baths Collection Bro...
By AKW

Download Now >>

Your high performance facade panel. With James Hardie, It’s Possible™ Brochure

Your high performanc...
By James Hardie

Download Now >>

James Hardie brings unique designs to life with beautiful fibre cement products that are built to last. It’s Possible™ Brochure

James Hardie brings...
By James Hardie

Download Now >>

fermacell® The Specification Guide Brochure

fermacell® The Speci...
By James Hardie

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

SOPRALENE FLAM 180 AF
SOPRALENE FLAM 180 AF

Membrane composed of elastomer modified bitumen and a non woven polyester reinforcement.The upper...

Read More >>

FLAGON SR DE PVC
FLAGON SR DE PVC

Membrane composed of flexible PVC and a polyester reinforcement. Available in different RAL...

Read More >>

FLAGON S PVC
FLAGON S PVC

Membrane composed of flexible PVC. Available in different RAL Colours.Used for detailing work. The...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Specification Insights with Majestic London Showers
Specification Insights with Majestic London Showers

Specification Insights with Majestic London Showers

Watch Now >>

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>