Green light for Crossrail station at Woolwich

Regeneration Tue, Mar 22, 2016 5:20 PM

Green light for Crossrail station at Woolwich

Transport for London (TfL) and the Department for Transport (DfT), sponsors of Crossrail, have confirmed that Crossrail services will call at Woolwich following the conclusion of a funding agreement for the completion of the station.

The sponsors have given Crossrail Limited the go ahead to begin the procurement process for the station fit out which will mean the station can open, alongside the rest of the central section of the Crossrail route, in December 2018.

The new station at Woolwich will support the regeneration of this part of London improving connectivity and access to job opportunities.

Work on the station box was completed by Berkeley Homes 4 months ahead of schedule in March this year when it was handed over to Crossrail Limited. A deal has now been reached to fund the remaining works required to fit out the station with contributions totalling £54 million being provided by Berkeley Homes, the Royal Borough of Greenwich (via a GLA grant and local developer contributions), and TfL. Any further funds required to make the station fully operational will be provided by Crossrail Limited from its existing budget.

A Crossrail station at Woolwich was not within the original scope of the project. However, during the passage of the Crossrail Bill, an agreement was reached for Berkeley Homes to construct the station box. This agreement was confirmed in February 2011. Since then TfL and DfT have been in discussions with Berkeley Homes and the Royal Borough of Greenwich to develop an additional funding package for the fit out of the station so that it is ready for trains to serve the station when they start operating at the end of 2018.

The new station will improve transport connectivity, providing a direct route to Canary Wharf, central London and beyond. It will support sustainable economic development and population growth by increasing capacity and reducing congestion on the transport network.

Crossrail Minister Stephen Hammond MP said: "This is great news for the people of Woolwich and the Royal Borough of Greenwich. A Crossrail station will provide significant opportunities for regeneration in the area, supporting jobs and growth and dramatically improving connectivity for people travelling between Woolwich and Canary Wharf, the City and the West End."

Mike Brown MVO, Managing Director of London Underground and Rail, said: “This is a positive step forward and we are pleased work can now progress on the station which will open when the rest of the route through central London starts operating at the end of 2018 providing better connectivity with journeys times of just eight minutes to Canary Wharf and 15 minutes to Bond Street."

John Anderson, Executive Director of Berkeley Homes, said: "We have always been wholly committed to a Crossrail station within our flagship Royal Arsenal Riverside development and this is a vital step forward in the Crossrail project. This announcement is welcome news, not just for Woolwich, but for the whole of south east London.

"Thousands of residents and businesses will benefit from significantly improved journey times, enhancing the opportunities and quality of life for many by increasing access to employment and transforming social mobility for local people. The significance of this important milestone for Woolwich cannot be overstated and we are proud to play an integral part in the area’s regeneration."

An OJEU notice has been published. An invitation to tender is expected to be issued in late 2013 and work starting in late 2014 ready for the station to be operational at the end of 2018.

Featured News

Specification news
Fassa UK unveils new range of self-levelling screeds

Fassa UK is excited to introduce our exceptional range of self-levelling screeds, now...

Read More >>

Specification news
Schlüter-Systems at the JJ Mack Building

Just 150m from Farringdon Station, the JJ Mack Building on Charterhouse Street is...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

HPS200 Ultra Case Study Brochure Brochure

HPS200 Ultra Case St...
By Tata Steel

Download Now >>

Confidex Datasheet Brochure

Confidex Datasheet
By Tata Steel

Download Now >>

Prisma UK 2024 Brochure

Prisma UK 2024
By Tata Steel

Download Now >>

HPS200 Ultra UK Brochure

HPS200 Ultra UK
By Tata Steel

Download Now >>

Amtico Bio Support Document  Brochure

Amtico Bio Support D...
By Amtico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

​The Confidex® Guarantee
​The Confidex® Guarantee

Offers the most comprehensive guarantee for pre-finished steel products in Europe and provides peace...

Read More >>

Colorcoat HPS200 Ultra®
Colorcoat HPS200 Ultra®

Colorcoat HPS200 Ultra®Super durable guaranteed performance.Designed to withstand even the most...

Read More >>

Prisma
Prisma

Colorcoat Prisma®Aesthetics that last, guaranteed.Colorcoat Prisma® demonstrates a step change by...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>