Preprufe provides year round protection for new hotel

Latest News Tue, Mar 22, 2016 5:05 PM

Preprufe provides year round protection for new hotel

On the purpose-built central island of Bahrain Business Bay, the $2.5 billion waterfront development, the application of Grace Construction Products’ Preprufe waterproofing membrane has provided unrivalled waterproofing and concrete protection for the Kingdom of Bahrain’s first Four Seasons Hotel – whilst helping the development to achieve 500,000 accident-free working hours on site.

Designed by New York-based architects Skidmore, Owings & Merrill, the landmark project is being built by Six Construct on reclaimed land just 500 metres from the bay’s actual shoreline.

During the initial construction phase, the 50 storey building required a reliable, fast applied waterproofing system which would not only prevent water ingress but provide exceptional concrete protection against chloride and sulphate attack.

For a comprehensive waterproofing solution, and having used the product on a number of successful projects previously, Skidmore, Owings & Merrill once again specified Preprufe 300R waterproofing membrane from worldwide leader in construction products, Grace.

Designed with synthetic adhesive layers combined with a robust HDPE film, Preprufe was chosen for its ability to meet tight project timeframes and exceptional protection levels in critical areas. Providing a permanent physical barrier, it will protect the structure from corrosive groundwater- found in coastline environments.

Using Grace’s patented Advanced Bond Technology, this enables concrete to aggressively adhere to Preprufe, forming a unique intimate seal which prevents any water migration between the waterproofing and the structure and substantially reduces the risk of leaks. As a result, any potential breaches are localised to prevent any water tracking between the waterproofing membrane and the structure.

No other system on the market protects a substructure from the harmful effects of water, vapour and gas better than Preprufe. It can also be applied on wet substrates or in hot climates and is immediately ready without protective layers to receive rebar installation, which further accelerates the construction programme and enables contractors to deliver challenging projects on time and on budget.

Bituthene 8000 HC waterproofing membrane was also specified to be post-applied to a series of podium decks, delivering complete structural protection from rainwater and the corrosive coastal environment.

In June 2012, the landmark development logged over 500,000 accident-free working hours on site – assisted by the application of Preprufe and Bituthene membranes. Fast, user-friendly and with no hot works required, the Grace waterproofing systems delivered optimum levels of waterproofing and concrete protection – with health and safety performance to match.

Scheduled for completion by end of 2013, the Four Seasons Hotel Bahrain Bay will become the latest in the five-star chain’s portfolio of international properties. With Preprufe and Bituthene an integral part of the structure, the hotel will benefit from reliable and durable waterproofing which also meets the highest standards.

Featured News

Specification news
Government’s £39bn programme needs plan-led system...

The Royal Town Planning Institute (RTPI) has long advocated for increased funding for...

Read More >>

Specification news
UKGBC announces new innovation initiative with...

A new initiative between UKGBC, developer FORE Partnership and Bill Gates’...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

HPS200 Ultra Case Study Brochure Brochure

HPS200 Ultra Case St...
By Tata Steel

Download Now >>

Confidex Datasheet Brochure

Confidex Datasheet
By Tata Steel

Download Now >>

Prisma UK 2024 Brochure

Prisma UK 2024
By Tata Steel

Download Now >>

HPS200 Ultra UK Brochure

HPS200 Ultra UK
By Tata Steel

Download Now >>

Amtico Bio Support Document  Brochure

Amtico Bio Support D...
By Amtico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

​The Confidex® Guarantee
​The Confidex® Guarantee

Offers the most comprehensive guarantee for pre-finished steel products in Europe and provides peace...

Read More >>

Colorcoat HPS200 Ultra®
Colorcoat HPS200 Ultra®

Colorcoat HPS200 Ultra®Super durable guaranteed performance.Designed to withstand even the most...

Read More >>

Prisma
Prisma

Colorcoat Prisma®Aesthetics that last, guaranteed.Colorcoat Prisma® demonstrates a step change by...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>