Latest News Tue, Mar 22, 2016 5:01 PM
Having successfully supplied numerous roof access systems to many locations within the education sector, SAFETYWORKS & Solutions were delighted to provide a comprehensive roof safety solution for installation at The University of Hertfordshire.
The University of Hertfordshire is the UK’s leading business-facing University and one of the region’s largest employers with over 2,700 staff and a turnover of more than £235 million. With a student community of over 24,500 including more than 2,000 international students from over eighty five different countries, the University has a global network of over 165,000 alumni.
The project involved upgrading the roof access and safety systems on the McLaughlin Building. Following a comprehensive site assessment of the existing systems, SAFETYWORKS & Solutions submitted a report and plan of recommendation for the supply of a new, improved system that would enable operatives to undertake maintenance tasks at height safely and securely.
For edge protection and easy movement around the roof areas, 242 l/m of Easyguard free standing handrails were installed. Installation is rapid due to the easily assembled design, with the base plates fitted with bonded ribbed rubber mats, including an EPDM foam infill which helps to reduce heat transference to the roof membrane, which in turn assists to minimise membrane degradation. Galvanised to BS/EN 1461, Easyguard has been proven throughout a variety of locations including hospitals, schools, sports stadia, housing associations, and industrial buildings to be highly durable, and cost efficient.
To ensure safe roof access to the tank room, SAFETYWORKS & Solutions manufactured and installed a 4m Free Standing Access Ladder.
In addition, SAFETYWORKS managed on-site logistics to ensure the smooth completion of this installation, including provision of cranes, the delivery to site of 12 tonnes of ballast, and the placement of 500 PV panels and stands on behalf of the PV installation company.
Commenting on the project, Marco Norman, Managing Director of SAFETYWORKS & Solutions said, “We have an extensive portfolio of successful installations within the education sector, and were delighted to utilise our experience and understanding of this environment, and its requirements to supply a cost effective, fast track roofing system to Hertfordshire University”.
For all of your ‘safety at height’ requirements including Walkways, Freestanding and Fixed Handrail Systems, Fall Restraint and Arrest Systems, Demarcation, and Steel Access Ladders and Staircases, please telephone SAFETYWORKS & Solutions on 01487 841400 or visit www.safetyworksandsolutions.co.uk
Featured News
The workplace has been permanently transformed in the wake of the post-pandemic...
KERDI waterproofing, KERDI-LINE drain and shower board with timber floorRecent...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
Proctors Spacetherm...
By A Proctor Group Ltd.
Proctors Proctor Pas...
By A Proctor Group Ltd.
Proctors Air Brochur...
By A Proctor Group Ltd.
Proctors Modular & O...
By A Proctor Group Ltd.
Proctors Hamm Princi...
By A Proctor Group Ltd.
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Membrane composed of elastomer modified bitumen and a non woven polyester reinforcement.The upper...
Membrane composed of flexible PVC and a polyester reinforcement. Available in different RAL...
Membrane composed of flexible PVC. Available in different RAL Colours.Used for detailing work. The...
CONSTRUCTION VIDEOS - LATEST VIDEOS
https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....
A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...
We designed and installed a new dining area canopy for John Spendluffe Technology College. This has...