Sustainable Pre-engineered Classrooms (SPEC) from Fordingbridge: a sustainable, permanent solution

Latest News Tue, Mar 22, 2016 5:21 PM

Sustainable Pre-engineered Classrooms (SPEC) from Fordingbridge: a sustainable, permanent solution

At Fordingbridge we can deliver a Sustainable Pre-engineered Classroom (SPEC) in just 16 weeks from concept to completion. This permanent solution offers a quality energy-efficient teaching environment compared to the cheaper temporary options available today. Our construction time is quick and efficient, causing minimal disruption to the school day and carried out by a CRB-checked installation team; a full health and safety compliance/accreditation is integral to our service.

Our SPEC building provides:

• an inspiring multi-use space designed to be flexible and versatile

• a permanent solution with a long lifespan, not a temporary fix

• sustainable, energy-efficient and cost-effective accommodation

• low maintenance and low running costs

Special features come as standard with a Fordingbridge SPEC classroom, including:

Timber frame: our FSC-certified curved timber frame is carbon neutral and gives a warm yet contemporary feel

Super insulation: a ‘fabric first’ approach means our insulation value is 40% better than building regulations require, reducing your energy requirements all year round

Air tightness: conserves heat, minimises draughts and cold air infiltration, reducing your energy bills

Intelligent lighting system: alters in conjunction with the outside light levels to ensure the correct lighting environment

Green roof: our attractive wildflower meadow roof is an optional extra that slows rainwater runoff, attenuates exterior noises and provides additional insulation

Acoustic design: built in to exceed relevant standards

Underfloor heating: provides even heating with very low energy demand to save running costs and eliminates hot-touch, space-consuming radiators

Air sourced heat pump: absorbs energy from the air outside and transfers it to an insulated solid floor

Thermal mass: prevents overheating in summer and stores warmth in winter; the underfloor pipes giving very low running costs; no need for gas connections or oil tanks

Our SPEC building is designed with multi-purpose use and flexibility of space in mind, offering a fully DDA compliant 30-pupil classroom, entrance lobby, storage area and adequate toilet facilities as shown in the floorplan.

Our proven high-quality construction methodology is built on 20 years of experience in the education sector. Contact us to arrange a no-obligation FREE site visit and consultation at www.fordingbridge.co.uk.

 

Featured News

Specification news
Mitsubishi Electric launches TrainME tool to support...

As the UK accelerates the transition to low-carbon heating, the need for a skilled...

Read More >>

Specification news
Silver linings welcomed despite ONS figures showing...

Total construction output is estimated to have fallen by 1.1% in the three months to...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

ACO Blue Roof Guide – Vol 2 Brochure

ACO Blue Roof Guide...
By ACO Building Drainag...

Download Now >>

Stannah Commercial Brochure Brochure

Stannah Commercial B...
By Stannah Group

Download Now >>

Stannah Midilift CLS Brochure

Stannah Midilift CLS
By Stannah Group

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

AlarmCalm
AlarmCalm

OverviewAlarmCalm is a powerful, flexible false fire alarm management solution that’s simple to...

Read More >>

QuickZone
QuickZone

OverviewQuickZone is our fuss-free conventional fire panel range.Quick to fit, configure and...

Read More >>

ExGo
ExGo

OverviewExGo provides a simple, dependable solution to complex fire protection problems in high-risk...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

The UK's No 1 Pool, Spa and Wellness Show – SPATEX 30 secs
The UK's No 1 Pool, Spa and Wellness Show – SPATEX 30 secs

And there’s a chance to do it all over again when the BIG 30th anniversary edition of SPATEX 2026...

Watch Now >>

Reclaimed Brick Company Leah's Yard Square Sheffield
Reclaimed Brick Company Leah's Yard Square Sheffield

Reclaimed Brick Company is part of Leah's Yard Square in Sheffield, a historic site revitalised for...

Watch Now >>

Day in the life of a Reclamation Yard
Day in the life of a Reclamation Yard

A typical day at a reclamation yard is filled with activity and discovery. Early mornings often...

Watch Now >>