First turf cut at new University of Bath Centre for the Arts

Regeneration Tue, Mar 22, 2016 5:21 PM

First turf cut at new University of Bath Centre for the Arts

The official start of construction of the University of Bath’s new Centre for the Arts building was marked by John Struthers, Director of the Institute of Contemporary Interdisciplinary Arts, who cut the first turf at a special ground-breaking ceremony.

Mr Struthers said: “I am very excited that construction is now underway and look forward to establishing the Centre as a national hub for contemporary arts.

"The new building will also act as an extra cultural resource for Bath and the surrounding region, complementing the city’s arts facilities and giving local artists, musicians and performers the opportunity to develop in a dedicated creative environment.”

Leadbitter, a subsidiary of Bouygues UK, is building the Centre on behalf of the University of Bath under a £7.25 million design and build contract. As well as the new three storey aluminium-clad building, the scheme involves the complete refurbishment of a theatre adjacent to the site.

The Centre for the Arts will include performance and dance studios, art galleries, two artists’ studios, an ensemble rehearsal room, several music practice rooms, offices, plus a café. There will also be a dedicated ‘Executive Education Suite’ on the first floor which will include a small lecture theatre and breakout spaces for the University’s School of Management.

Rob Bradley, Managing Director of Leadbitter and Bouygues UK’s Western team, said: “The new Centre for the Arts will provide the University and surrounding areas with modern facilities for arts events and activities.

“Leadbitter is very experienced in constructing high quality statement buildings of this type, so we are positioned perfectly to deliver this project for the University.”

The new Centre for the Arts is due to be completed in late 2014 and forms part of the University’s three-year campus improvement project.

Featured News

Specification news
Introducing Ebro AB by Zentia – a true black ceiling...

Zentia, a market-leading UK manufacturer of high-performance acoustic ceiling and...

Read More >>

Specification news
Looking back at the iconic Gasholders in Kings Cross

Located in the heart of London, initially constructed 160 years ago, the Gasholder...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

2026 Product Brochure Brochure

2026 Product Brochur...
By ​The Radiator Compan...

Download Now >>

System for Laying Floor and Wall Coverings Brochure

System for Laying Fl...
By FassaFloor

Download Now >>

Training for Excellence Brochure

Training for Excelle...
By Aico

Download Now >>

The Connected Home Solution Brochure

The Connected Home S...
By Aico

Download Now >>

Safety First, Aico First Brochure

Safety First, Aico F...
By Aico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Glass Partition Walls
Glass Partition Walls

Partition wall systems made of glass allow transparent room partition. They open, divide and...

Read More >>

FASSAFILL MEDIUM
FASSAFILL MEDIUM

Water repellent cement-based sealant for grouting joints from 2 to 12 mm, resistant to mould and...

Read More >>

FASSA AQUAZIP FAST
FASSA AQUAZIP FAST

Two-component elastic cement membrane, quick drying even at low temperatures, for waterproofing and...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

DAB EsyBox Pop | Compact booster pump for perfect home water pressure
DAB EsyBox Pop | Compact booster pump for perfect home water pressure

Struggling with weak showers and inconsistent flow? The DAB EsyBox Pop is the revolutionary,...

Watch Now >>

Marsh Industries - Phos-Lite
Marsh Industries - Phos-Lite

Marsh Industries - Phos-Lite

Watch Now >>

Marsh Industries - Nutra-Lite
Marsh Industries - Nutra-Lite

Marsh Industries - Nutra-Lite

Watch Now >>