First supergantry installed on M25

Latest News Tue, Mar 22, 2016 5:22 PM

First supergantry installed on M25

The first superspan gantry is installed over the M25 near Junction 24 as part of the £188 million Managed Motorway scheme to upgrade the motorway between junctions 23 and 27.

Weighing 36 tonnes and measuring 40 metres across, it is the first of five superspan gantries which will be installed during the project being carried out by Skanska Balfour Beatty, on behalf of the Highways Agency.

The gantries will display valuable information for road users to help reduce congestion and ease traffic flow.

Skanska Balfour Beatty is a construction joint venture formed in 2009 to deliver improvements to reduce congestion on the M25 and adjoining routes for the M25 Connect Plus design-build-financeand-operate concession, on behalf of the Highways Agency.

Skanska Balfour Beatty Skanska Balfour Beatty completed a 61 kilometre Managed Motorway upgrade of the M25 in 2011 between Junctions 16 to 23 and Junctions 27 to 30 in 2011.

It is currently upgrading 46 further kilometres of the M25 to Managed Motorway between Junctions 5 & & through Kent and Surrey and between Junctions 23 and 27 through Hertfordshire. The projects are due to be complete by 2015.

Featured News

Specification news
Siderise named one of the Sunday Times Best Places to...

Siderise Group has been recognised as one of the Sunday Times Best Places to Work...

Read More >>

Specification news
Crittall forges new partnership with Secco Sistemi

Crittall Windows has announced a new strategic collaboration with Secco Sistemi, the...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Proctors Spacetherm Building & Construction Brochure

Proctors Spacetherm...
By A Proctor Group Ltd.

Download Now >>

Proctors Proctor Passive Brochure

Proctors Proctor Pas...
By A Proctor Group Ltd.

Download Now >>

Proctors Air Brochure Brochure

Proctors Air Brochur...
By A Proctor Group Ltd.

Download Now >>

Proctors Modular & Offsite Solutions Brochure

Proctors Modular & O...
By A Proctor Group Ltd.

Download Now >>

Proctors Hamm Principles Brochure

Proctors Hamm Princi...
By A Proctor Group Ltd.

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

SOPRALENE FLAM 180 AF
SOPRALENE FLAM 180 AF

Membrane composed of elastomer modified bitumen and a non woven polyester reinforcement.The upper...

Read More >>

FLAGON SR DE PVC
FLAGON SR DE PVC

Membrane composed of flexible PVC and a polyester reinforcement. Available in different RAL...

Read More >>

FLAGON S PVC
FLAGON S PVC

Membrane composed of flexible PVC. Available in different RAL Colours.Used for detailing work. The...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>

Dining Area Canopy at John Spendluffe Technology College
Dining Area Canopy at John Spendluffe Technology College

We designed and installed a new dining area canopy for John Spendluffe Technology College. This has...

Watch Now >>