First phase of university-backed £1bn development gets underway

Public Sector Tue, Mar 22, 2016 5:18 PM

First phase of university-backed £1bn development gets underway

The Chancellor of Cambridge University, Lord Sainsbury of Turville, and the Vice-Chancellor, Professor Sir Leszek Borysiewicz, marked the start of works for the University's 150-hectare mixed-use development at North West Cambridge, the University's largest single capital development project in its 800-year history, in a Ground-breaking ceremony.  

Representatives from the University and Colleges of Cambridge, local authorities, community members, and Project architects and consultants gathered to witness the Chancellor and Vice-Chancellor 'turn the first sods' at North West Cambridge.  

The Vice-Chancellor said: "The North West Cambridge site is important for Cambridge, for the UK and internationally. The development enables the University to plan ahead and to provide the environment and facilities that are vital to attracting world-class researchers. Our investment in North West Cambridge is a long-term and deep commitment: the development is a measure of Cambridge's confidence in itself and in its future."

The masterplan was designed to meet the University's long-term growth needs and planning consent was granted for the whole scheme in February 2013.  It includes 3,000 homes (50% key-worker housing for University and College staff), 2,000 bedspaces for post-graduate students, 100,000 sqm of research facilities and a local centre with public amenities.  

Roger Taylor, Project Director of North West Cambridge said "This development provides a tremendous opportunity for the University to work with the local authorities to create an urban extension that befits the city of Cambridge. Plans for Phase one look to provide a new high-quality built environment that reflects the existing qualities of the city, through the University working with 12 architectural practices of renown.  The commitment from the team is to create an urban environment that will be an exemplar of sustainable living, and one of which the University and wider community can be proud of. It is wonderful to see many of our friends and colleagues here to mark the start the Project."

The focus of the first phase of the development is on the local centre and residential provision, which includes 530 homes for qualifying University and College staff, 400 homes for sale through residential developers, accommodation for 300 post-graduate students, and public amenities including a supermarket, retail units, a primary school, nursery, doctors’ surgery, hotel and police touchdown office, as well as open green space for formal and informal recreation.   

Phase one of the development is estimated to cost some £280 million with the scheme in its entirety estimated to cost £1 billion. The first buildings in Phase one will be completed from late 2015.

Featured News

Specification news
Kalzip helps shape Northern Ireland’s landmark...

The new Belfast Grand Central Station stands as one of the most significant public...

Read More >>

Specification news
Smarter wastewater design starts here - the DrainMajor...

Modern commercial buildings place increasingly complex demands on building services...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Valley Through Range Brochure

Valley Through Range
By Filon Limited

Download Now >>

Safer Replacement Starts Below. Filon Fixsafe. Brochure

Safer Replacement St...
By Filon Limited

Download Now >>

A Smart Way to Refurbish Profiled Roofs. Over-Roofing. Brochure

A Smart Way to Refur...
By Filon Limited

Download Now >>

Site Assembled Rooflights & Specialist GRP Sheets Brochure

Site Assembled Roofl...
By Filon Limited

Download Now >>

Factory-Assembled Multi-Layer GRP Rooflights Brochure

Factory-Assembled Mu...
By Filon Limited

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Magply multi-functional board
Magply multi-functional board

Rainscreen CladdingAs a high performance, multi-functional board Magply features a Magnesium...

Read More >>

Magply recovery and protection boards
Magply recovery and protection boards

Magply recovery and protection boards have been developed to meet the roofing industry needs for a...

Read More >>

Safeshield XT Reflect
Safeshield XT Reflect

Safeshield XT Reflect is an A2-s1, d0 fire rated construction membrane for the use in high risk,...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide
Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide

Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...

Watch Now >>

Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions
Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions

Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...

Watch Now >>

Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study
Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study

This case study explores a stunning designer terrace featuring the Outdure QwickBuild system,...

Watch Now >>