FAITHFUL+GOULD AIDS MINISTRY OF JUSTICE ON £415M PFI PRISON SCHEME

Latest News Tue, Mar 22, 2016 4:55 PM

The first prison to be procured under the Private Finance Initiative (PFI) for a number of years has reached financial close, with Project Management and Cost Consultants, Faithful+Gould providing project management services to the Ministry of Justice National Offender Management Service (NOMS).

The £415 million Belmarsh West PFI New Prison in South London will be operated by Serco, and designed and built under a £100m construction contract by their construction partner Skanska. The new prison, built to category B standards, is designed to achieve BREEAM excellent rating.

Faithful+Gould was appointed to provide project management by the Ministry of Justice in September 2009 to see the scheme through to financial close and thereafter to completion of construction and opening, planned for the first half of 2012.

Geoff Lewis, Associate Director at Faithful+Gould and project manager for Belmarsh West Prison said: “This is an exciting project to be involved in that further demonstrates our strengths in both the prison sector and in managing PFI projects, which by their very nature require a certain set of skills and experience. We are proud to have worked with the Ministry of Justice National Offender Management Service to deliver a purpose built, modern prison that utilises previously unusable brownfield land.”

Faithful+Gould is also providing project management services on the Featherstone 2 project, which is a new build, traditionally procured prison with more than 1,500 spaces, and is the largest scheme currently being constructed in the sector.

Featured News

Specification news
Kier awarded major project to transform part of...

Kier has been appointed by King’s College London to deliver the redevelopment of...

Read More >>

Specification news
Performance plummets with market confidence in short...

Glenigan | Powered by Hubexo, one of the construction industry’s leading insight...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Your Specialist Partner in Composite Steel Roof & Floor Decking Brochure

Your Specialist Part...
By RMD Profiles Ltd

Download Now >>

PVC-U System Fully Reversible Windows by Epwin Window Systems Brochure

PVC-U System Fully R...
By Epwin window systems...

Download Now >>

Spectus Bevelled Windows and Doors Brochure

Spectus Bevelled Win...
By Epwin window systems...

Download Now >>

Vertical Sliding Sash Window Brochure

Vertical Sliding Sas...
By Epwin window systems...

Download Now >>

Two-Part Cill System Brochure

Two-Part Cill System
By Epwin window systems...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

DUOFLEX
DUOFLEX

DUOFLEX is a high quality elastomeric bitumen, hot bonded to the substrate incorporating the fleece...

Read More >>

TECSOUND
TECSOUND

TECSOUND is a polymer based, bitumen-free, high-density synthetic membrane. The combination of its...

Read More >>

ISOLAIR MULTI
ISOLAIR MULTI

ISOLAIR MULTI is a natural and ecological vapour-permeable, windproof and water-repellent thermal...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

RMD Profiles - UK Experts in Metal Decking, Design Installation
RMD Profiles - UK Experts in Metal Decking, Design Installation

At RMD Profiles, we’re more than just metal decking. From supply-only solutions to full design and...

Watch Now >>

A responsible addition: HIMACS shapes are now SCS-Certified for recycled content
A responsible addition: HIMACS shapes are now SCS-Certified for recycled content

HIMACS has long been the solid surface material of choice for architects and designers looking for a...

Watch Now >>

Our SUSTAINABILITY Roadmap
Our SUSTAINABILITY Roadmap

Myson has a clear sustainability strategy in line with the UN Sustainable Development Goals (SDGs)...

Watch Now >>