Energos awarded permit for new energy recovery facility

Public Sector Tue, Mar 22, 2016 5:05 PM

Energos awarded permit for new energy recovery facility

The Environment Agency has awarded a full Environmental Permit to energy from waste business Energos to operate a small scale advanced conversion technology (ACT) facility at Knowsley Industrial Park, Merseyside.

The 96,000 tonne-a-year Knowsley Energy Recovery Facility, using the patented Energos gasification process,  has also been selected by Merseyside Recycling and Waste Authority (MRWA) to manage short-term treatment of residual, non-recyclable waste, helping to divert it from landfill.

The project will create 9MW of green power, equivalent to the output of 15 large wind turbines. It is designed to complement local recycling initiatives and to process only non-hazardous, residual waste, with an ability to accept a variety of waste streams, including refuse derived fuel (RDF).

Steve Molyneux, Environment Manager for the Environment Agency, said: "We’ve carried out a thorough assessment of the application and consulted widely on the details. We’ve sought comments from other organisations, including Knowsley Council, Knowsley NHS, the Health Protection Agency and local people. The Environment Agency is confident that the proposed energy from waste facility will not harm human health or the environment."

The Environment Agency has set low limits for NOx emissions in recognition of Energos' capabilities of achieving NOx emissions of less than 25% of the EU limit, without any form of NOx abatement system.  

Energos Managing Director stated: "With more than 15 years and 560,000 hours of operational experience we can demonstrate a track record of outstanding emissions performance at our new build facilities across Europe.  The local community can take comfort from tight controls and our proven ability to meet these limits."

The first phase of work on the Energos Knowsley Energy Recovery facility has been completed and the second phase of work is expected to start in 2013.

“The facility could be completed by 2015," added Nick Dawber. "Despite the difficulties in the financial markets, we are making good progress in  securing finance for this £60m project."

The scheme will use an advanced conversion technology (ACT) gasification technique, which is a best practice clean technology. Rather than burning non-recyclable waste, it converts it into a gas via a rigorously controlled two-stage thermal treatment process - using the heat of partial combustion.  The gas is then fully combusted to generate heat, which is used to produce steam and electricity.

The combined heat and power process will generate heat for use by neighbouring businesses, as well as electricity.
The project will create 20 long term skilled jobs at the site and more than 50 jobs during the two-year construction period, with more jobs created through the supply and support chain.

“This is an environmentally responsible, community sized energy from waste solution that will ensure the diversion of biodegradable material from landfill.”, said Nick Dawber, "Our facilities generate renewable energy and displace the use of fossil fuels."

" We are committed to working with the local community to provide a world class facility that can bring long-term environmental and employment benefits locally, and provide part of a much needed green waste infrastructure that the country desperately needs."

"We set up the Knowsley Community Liaison Group back in 2008 to manage communication with residents and businesses and members have  been fully involved in the project and met at key points in the development cycle.

Energos advanced conversion technology has been selected for the treatment of residual waste at the proposed Milton Keynes Waste Recovery Park and at Glasgow City Council's proposed Recycling and Renewable Energy Centre.

Featured News

Specification news
Harmer SML below-ground drainage - cast-iron solutions...

Harmer SML Below-Ground Drainage is a trusted soil and waste system from Alumasc...

Read More >>

Specification news
Reynaers eases specification of access controls with...

As part of Reynaers’ suite of digital solutions, the Access Control Configurator...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

2026 Product Brochure Brochure

2026 Product Brochur...
By ​The Radiator Compan...

Download Now >>

System for Laying Floor and Wall Coverings Brochure

System for Laying Fl...
By FassaFloor

Download Now >>

Training for Excellence Brochure

Training for Excelle...
By Aico

Download Now >>

The Connected Home Solution Brochure

The Connected Home S...
By Aico

Download Now >>

Safety First, Aico First Brochure

Safety First, Aico F...
By Aico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Glass Partition Walls
Glass Partition Walls

Partition wall systems made of glass allow transparent room partition. They open, divide and...

Read More >>

FASSAFILL MEDIUM
FASSAFILL MEDIUM

Water repellent cement-based sealant for grouting joints from 2 to 12 mm, resistant to mould and...

Read More >>

FASSA AQUAZIP FAST
FASSA AQUAZIP FAST

Two-component elastic cement membrane, quick drying even at low temperatures, for waterproofing and...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

DAB EsyBox Pop | Compact booster pump for perfect home water pressure
DAB EsyBox Pop | Compact booster pump for perfect home water pressure

Struggling with weak showers and inconsistent flow? The DAB EsyBox Pop is the revolutionary,...

Watch Now >>

Marsh Industries - Phos-Lite
Marsh Industries - Phos-Lite

Marsh Industries - Phos-Lite

Watch Now >>

Marsh Industries - Nutra-Lite
Marsh Industries - Nutra-Lite

Marsh Industries - Nutra-Lite

Watch Now >>