Elliott Off-Site Secures £19.5m of Orders in August

Latest News Tue, Mar 22, 2016 5:03 PM

Elliott Off-Site Secures £19.5m of Orders in August

Elliott Off-Site Building Solutions continues to buck the economic trend with an unprecedented level of business growth, including a record order intake during August.

The off-site specialist has doubled turnover for each of the past two years. With a record order book and several sizeable contracts at final tender stage, it looks set to double sales yet again during 2013.

Recent multi-million pound projects secured by Elliott Off-Site include a contract with McDonalds UK to design and build its new format restaurants, along with a number of contract awards from multiple London borough’s to design and build a series of new school buildings.

Alongside these, Elliott Off-Site has secured a series of other sizeable contracts in the education, healthcare and retail sectors, which demonstrates the adaptability of the company’s design and build solutions to span across most market sectors.

“Although the building industry continues to face economic difficulty, we have managed to buck the trend by focussing on what we do best – providing modern, user-friendly buildings tailored to suit our customers,” said Paul Lang, Managing Director at Elliott Off-Site Building Solutions.

“We have a clear business strategy and strong management team and that allows us to replicate our successes in a wide range of end user markets.”

“However, we are not complacent and we continue to invest back into our business. We have just unveiled several innovative sector specific solutions that will open up many new opportunities for our company over the next few years.”

New innovations from Elliott include a building solution that addresses the needs of schools looking for a way forward from the James Review. As part of a design and build programme it delivers cost savings through standardisation, whilst providing sufficient flexibility to create distinct, appealing educational buildings.

Paul Lang added: “Our off-site system provides customers with high quality buildings that deliver all the value for money benefits of modern methods of construction, and that has stood us in good stead. We are happy to talk to any customer looking for an effective method of addressing their building requirements.”

Elliott Off-Site provides a complete design and build solution, which means clients have a single point of contact for the duration of the contract.

Projects recently completed by Elliott Off-Site include the new West of England Multiple Sclerosis Centre in Bristol, East Norfolk Sixth Form College, where the company has been awarded a total of six projects since 2004, through to the new translational medical centre at Manchester Royal Infirmary.

For more information on Elliott Off-Site Building Solutions, visit: www.elliottuk.com/off-site-building-solutions or call: 01274863221. Alternatively, email:construction@elliottuk.com

Featured News

Specification news
Playing the long game

Specifiers are increasingly prioritising long-term performance over short-term...

Read More >>

Specification news
Laying the Foundations for Industry Change Brick by...

Six in 10 construction students leave the profession shortly after completing their...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Proctors Spacetherm Building & Construction Brochure

Proctors Spacetherm...
By A Proctor Group Ltd.

Download Now >>

Proctors Proctor Passive Brochure

Proctors Proctor Pas...
By A Proctor Group Ltd.

Download Now >>

Proctors Air Brochure Brochure

Proctors Air Brochur...
By A Proctor Group Ltd.

Download Now >>

Proctors Modular & Offsite Solutions Brochure

Proctors Modular & O...
By A Proctor Group Ltd.

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

SOPRALENE FLAM 180 AF
SOPRALENE FLAM 180 AF

Membrane composed of elastomer modified bitumen and a non woven polyester reinforcement.The upper...

Read More >>

FLAGON SR DE PVC
FLAGON SR DE PVC

Membrane composed of flexible PVC and a polyester reinforcement. Available in different RAL...

Read More >>

FLAGON S PVC
FLAGON S PVC

Membrane composed of flexible PVC. Available in different RAL Colours.Used for detailing work. The...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>

Dining Area Canopy at John Spendluffe Technology College
Dining Area Canopy at John Spendluffe Technology College

We designed and installed a new dining area canopy for John Spendluffe Technology College. This has...

Watch Now >>