Elliott Off -Site Announces Expansion

Latest News Tue, Mar 22, 2016 5:02 PM

Elliott Off -Site Announces Expansion

Elliott Off-Site Building Solutions has announced that it is creating several new jobs and increasing production capacity at its 13-acre Carnaby site in North Yorkshire.

Expansion of the company’s off-site manufacturing facility also involves the opening of an additional assembly facility in the area.

Major investment in its manufacturing facility follows the news that the company has recently secured a number of high value contracts, including both single storey and new two storey restaurants for McDonalds.

Other major new business secured by Elliott Off-Site Building Solutions includes the design and build of a sixth form centre at Harris Academy Chafford Hundred, Essex, and a new three-storey GP surgery in Hillingdon.

The company has just completed the new West of England Multiple Sclerosis Centre in Bradley Stoke, Bristol. The purpose built facility is one of the largest and most advanced in the UK, offering therapies to over 450 people across the South West.

Paul Lang, Managing Director of Elliott Off-Site Building Solutions, said: “We have secured a number of high value contracts recently including McDonald’s restaurants, a contract that will extend for an initial two years. We are one of the few companies in the construction sector to achieve growth and it is doubly satisfying to know that this is created new job opportunities.”

He added: “An increasing number of clients are realising that our off-site system delivers higher quality, better value for money buildings. In today’s economic climate, that can make a significant difference to a project’s overall viability and ultimately the developer’s return on investment.”

The McDonald’s restaurants are constructed using Elliott’s highly engineered volumetric units at its site in Carnaby. A number of restaurants have already been successfully handed-over, which are completed a four week site schedule from when the units are delivered to site – a requirement simply not possible with conventional construction techniques. Elliott completes over 90% of the restaurant buildings at its manufacturing facility before delivering them to site.

Elliott Off-Site Building Solutions is able to act as concept designer and Principal Contractor to provide clients and building specifiers with a one-stop building solution. The company regularly completes projects in the retail, education, office and health sectors.

All buildings are designed to comply with latest building regulations as well as sector specific legislation such as Health Technical Memoranda (HTM), Building Bulletins and BREEAM standards.

Elliott Off-Site Building Solutions has over 45 years of delivering innovative off-site design and build solutions and is able to help clients achieve the highest environmental ratings and carbon neutrality.

For more information on Elliott Off-Site Building Solutions, visit: www.elliottuk.com/off-site-building-solutionsor call: 01274 863221. Alternatively, email: construction@elliottuk.com

 

Featured News

Specification news
INCA survey reveals size of the UK EWI industry

INCA, the recognised trade association for the external wall insulation (EWI)...

Read More >>

Specification news
MPs launch new inquiry looking at social housing and...

The Housing, Communities and Local Government (HCLG) Committee has today launched a...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

HPS200 Ultra Case Study Brochure Brochure

HPS200 Ultra Case St...
By Tata Steel

Download Now >>

Confidex Datasheet Brochure

Confidex Datasheet
By Tata Steel

Download Now >>

Prisma UK 2024 Brochure

Prisma UK 2024
By Tata Steel

Download Now >>

HPS200 Ultra UK Brochure

HPS200 Ultra UK
By Tata Steel

Download Now >>

Amtico Bio Support Document  Brochure

Amtico Bio Support D...
By Amtico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

​The Confidex® Guarantee
​The Confidex® Guarantee

Offers the most comprehensive guarantee for pre-finished steel products in Europe and provides peace...

Read More >>

Colorcoat HPS200 Ultra®
Colorcoat HPS200 Ultra®

Colorcoat HPS200 Ultra®Super durable guaranteed performance.Designed to withstand even the most...

Read More >>

Prisma
Prisma

Colorcoat Prisma®Aesthetics that last, guaranteed.Colorcoat Prisma® demonstrates a step change by...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>