Door-Stop delivers 3 day doors to WDH 98% on-time-in-full

Latest News Tue, Mar 22, 2016 4:59 PM

Door-Stop delivers 3 day doors to WDH 98% on-time-in-full

Door-Stop is leading the way for on-time-in-full deliveries in social housing, with an impressive 98.56% success rate on its composite doors, supplied in just 3 days. Since winning an order for 6,000 composite doors from Wakefield District Housing (WDH) in February, Door-Stop’s strong performance has led to another contract with the association for 44 doors for new build.

The industry norm for delivering composite door is around 6-8 weeks, due to the complexity of managing input from surveyors, residents, contractors and subcontractors. Door-Stop has automated these processes to offer social housing the same 3 day delivery service it supplies to its 4,000 retail installer customers. Door-Stop continuously measures its on-time-in-full ratings for all clients averaging 97% to 99% - this figure is updated weekly on www.door-stop.co.uk.

Door-Stop’s performance is helping WDH reach its target of upgrading housing stock to the Wakefield Standard, (a higher specification than the Government's Decent Homes Standard). Its 3 day delivery service saves time and money through more flexible project management, taking account of bad weather and tenant absence.

James Martin, Strategic Programming Manager for WDH comments: “The quick turn-around time from order to delivery is exactly what we want. The quality of the doors enhances the excellent service we already provide to our tenants.”

Noted by The Telegraph as one of Britain’s Brightest Businesses, Door-Stop has a current turnover of £20 million and manufactures more than 1,100 composite doors a week.

Visit www.door-stop.co.uk or call 01623 446336 to find out more about the Door-Stop range, which now includes energy rated doors from A-D.

Featured News

Specification news
Downturn in UK manufacturing eases as rates of decline...

The downturn in the UK manufacturing sector showed further signs of slowing at the...

Read More >>

Specification news
Construction launches Health, Safety and Wellbeing...

The Minister for Industry has launched the Construction Leadership Council’s Health...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

HPS200 Ultra Case Study Brochure Brochure

HPS200 Ultra Case St...
By Tata Steel

Download Now >>

Confidex Datasheet Brochure

Confidex Datasheet
By Tata Steel

Download Now >>

Prisma UK 2024 Brochure

Prisma UK 2024
By Tata Steel

Download Now >>

HPS200 Ultra UK Brochure

HPS200 Ultra UK
By Tata Steel

Download Now >>

Amtico Bio Support Document  Brochure

Amtico Bio Support D...
By Amtico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

​The Confidex® Guarantee
​The Confidex® Guarantee

Offers the most comprehensive guarantee for pre-finished steel products in Europe and provides peace...

Read More >>

Colorcoat HPS200 Ultra®
Colorcoat HPS200 Ultra®

Colorcoat HPS200 Ultra®Super durable guaranteed performance.Designed to withstand even the most...

Read More >>

Prisma
Prisma

Colorcoat Prisma®Aesthetics that last, guaranteed.Colorcoat Prisma® demonstrates a step change by...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>