Construction industry's cash position and margins are not sustainable

Latest News Tue, Mar 22, 2016 5:38 PM

Construction industry's cash position and margins are not sustainable

Analysis of the largest UK construction contractors indicates that despite greater deal-flow, the financial position of many contractors remains weak, with cash balances and margins down, according to a report published by KPMG.

The report “Construction Barometer: Recovery in Sight?” analyses the operating margins, cash balances and order books of 14 Tier 1 contractors from 2007 through to 2013.

The detailed analysis revealed:

  • Net cash balances declined in 2013 and are now close to half their 2010 peak
  • As cash generated from operations have all but dried up since 2010, cash balances have been increasingly supported by significant sale of assets.
  • Operating margins in construction continue to be squeezed. From a high of 2.8% across the industry in 2010, operating margins have fallen to an average of just 1.2% in 2013
  • Persistent inflation in sub-contractor markets suggests that the negative pressure on margins is unlikely to ease off any time soon. This position is further highlighted by the several profit warnings issued in the first half of 2014
  • Order books tell a slightly more optimistic story from margins and cash, however, reporting growth from 2012 to 2013
  • The UK government’s infrastructure spend indicates that there is plenty yet to come with over £116 billion committed to over 1,886 projects.

Richard Threlfall, KPMG’s UK Head of Infrastructure, Building and Construction said: “Construction contractors have been struggling with some of the most difficult market conditions ever encountered and even now – with all evidence pointing to sustained recovery – the industry faces real profitability challenges.  

“Current margin and cash levels are unsustainable. With subcontractor rate increases and labour market shortages largely outside of contractors’ control, it is critical they continue to focus on improving their own efficiency.

“The industry can though take heart from the first signs of a recovery in order books. Ultimately, we believe contractors need to hang on until supply and demand for subcontractors and labour come back into balance, which we predict is still a year off. With good forward planning, strong businesses should be investing now in their supply chain and technology to take advantage of the £45 billion a year tidal wave of future work.”

Featured News

Specification news
More money and more land needed for London CLTs and...

London’s community land trusts and housing cooperatives need more financial support...

Read More >>

Specification news
SRM appointed to deliver the North East Space Skills...

Sir Robert McAlpine has been appointed as the main contractor by Northumbria...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Your high performance facade panel. With James Hardie, It’s Possible™ Brochure

Your high performanc...
By James Hardie

Download Now >>

James Hardie brings unique designs to life with beautiful fibre cement products that are built to last. It’s Possible™ Brochure

James Hardie brings...
By James Hardie

Download Now >>

fermacell® The Specification Guide Brochure

fermacell® The Speci...
By James Hardie

Download Now >>

Hardie backer fibre cement backerboard for Tile & Stone  Brochure

Hardie backer fibre...
By James Hardie

Download Now >>

RIVERSTONE® - DISCOVER NATURAL PHYLLITE Brochure

RIVERSTONE® - DISCOV...
By SSQ

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Senses White Fleck Kitchen Surfaces
Senses White Fleck Kitchen Surfaces

Senses Kitchen Surfaces. Beautifully Crafted, Effortlessly Maintained. The Senses range of...

Read More >>

SM 485: fast-setting, self-levelling smooth coat for interior floors
SM 485: fast-setting, self-levelling smooth coat for interior floors

FASSA's new SM 485: Your choice for a fast-setting, self-levelling smooth coat for interior floors,...

Read More >>

SL 416: A fast-setting, self-levelling smooth coat for interior floors
SL 416: A fast-setting, self-levelling smooth coat for interior floors

FASSA's new SL 416: A fast-setting, self-levelling smooth coat for interior floors. With superb...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Specification Insights with Majestic London Showers
Specification Insights with Majestic London Showers

Specification Insights with Majestic London Showers

Watch Now >>

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>