While London sleeps, Bonsers is at work

Latest News Tue, Mar 22, 2016 5:23 PM

While London sleeps, Bonsers is at work

Bonsers Restoration has completed a project at London’s Waterloo Station which saw a specialist team work through the night ensuring minimum disruption to the hundreds of thousands of commuters who use the station each day.

Working as a specialist sub-contractor to Bam Construction and First Call Building Services, Bonsers cleaned and repaired the Portland Limestone and brickwork of the original Waterloo station building in preparation for a new floor of high-end retail units to be added.

Jo Bonser is managing director at Bonsers. She said: “This was a great project to work on because Waterloo Station is such a well-known and iconic London building. Four of our team, made up of cleaning and restoration specialists worked through the night from Sundays to Thursdays because the station is far too busy at any other time.

“We faced many challenges, for example getting all the plant and materials to and from the working areas during a short working time frame, applying any temporary protection and removing all evidence of our presence before busy commuters appeared and shops reopened.  All fumes had to be controlled otherwise we ran the risk of alarms being triggered which would lead to a station shut down.

“Additionally, all access was by mobile scaffold towers and cherry pickers and we had to think about containment of waste and water generated from the Doff and Jos cleaning systems.  All these elements made this piece of work all the more interesting and rewarding for us.”

The new retail units that have been launched as part of the overall £220m Waterloo Station balcony development include beauty store Kiehl’s, eateries such as Yo Sushi! And Carluccio’s as well as clothing brands Joules, Fat Face and Oliver Bonas.  

There has been a railway station at Waterloo since 1848 but the building in existence today was completed in 1922 with 21 platforms and a concourse 800 feet long.

Featured News

Specification news
New guide for clients launched at Houses of Parliament

The Chartered Institute of Building’s (CIOB) new (2nd edition) CIOB Client Guide:...

Read More >>

Specification news
Cellecta is urging architects, developers, and...

Cellecta Ltd, the UK manufacturer of the trademark-registered ScreedBoard®, is...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Proctors Spacetherm Building & Construction Brochure

Proctors Spacetherm...
By A Proctor Group Ltd.

Download Now >>

Proctors Proctor Passive Brochure

Proctors Proctor Pas...
By A Proctor Group Ltd.

Download Now >>

Proctors Air Brochure Brochure

Proctors Air Brochur...
By A Proctor Group Ltd.

Download Now >>

Proctors Modular & Offsite Solutions Brochure

Proctors Modular & O...
By A Proctor Group Ltd.

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

SOPRALENE FLAM 180 AF
SOPRALENE FLAM 180 AF

Membrane composed of elastomer modified bitumen and a non woven polyester reinforcement.The upper...

Read More >>

FLAGON SR DE PVC
FLAGON SR DE PVC

Membrane composed of flexible PVC and a polyester reinforcement. Available in different RAL...

Read More >>

FLAGON S PVC
FLAGON S PVC

Membrane composed of flexible PVC. Available in different RAL Colours.Used for detailing work. The...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>

Dining Area Canopy at John Spendluffe Technology College
Dining Area Canopy at John Spendluffe Technology College

We designed and installed a new dining area canopy for John Spendluffe Technology College. This has...

Watch Now >>