Bison steps up to energy from waste project

Public Sector Tue, Mar 22, 2016 5:20 PM

Bison steps up to energy from waste project

Bison Manufacturing Ltd, the UK’s leading precast concrete manufacturer, has supplied its market leading precast concrete stairs for the construction of a new multi-million pound renewable energy facility near Wolverhampton.
 
Working closely with SCWS Steel fabrications, the Bison team manufactured multiple bespoke precast stairs and landing units for installation at Staffordshire County Council’s new Energy Recovery Facility (ERF), which is being developed by Veolia Environmental Services in partnership with CNIM Clugston Staffordshire Ltd.
 
Bison’s fire resistant precast stairs and landings offer immediate access routes and minimal in-situ concrete, saving time and resource on site. They are suitable for use across a wide range of applications including hospitals, schools, offices, car parks, retail, multi residential developments and secure units.
 
Ian Burchnall, Contracts Manager at SCWS, the structural steelwork provider for the project, comments: “Having worked with Bison Manufacturing on previous projects we knew they could be relied upon to deliver high quality products to the timescales required. Their lifting hooks are particularly useful for being able to lift the products into position quickly, safely and accurately, which all helps towards the successful completion of the project.”
 
Mike Nelson, Commercial Manager at Bison Manufacturing, adds: “Working with SCWS from an early design stage, we utilised our manufacturing capabilities to create cost-effective, very high quality precast stairs and landings which met the project’s exact requirements. While the fact that it is a renewable energy site highlights the many sectors that our precast concrete products lend themselves to.”
 
One of Staffordshire County Council’s most ambitious projects to date, the Staffordshire Energy Recovery Facility will divert up to 300,000 tonnes of household waste from landfill, which cannot be recycled or composted, generating enough electricity to power 32,000 homes. It is anticipated that the construction of the facility will be completed by December 2013.

Featured News

Specification news
ASSA ABLOY launches new DC850 and DC870 concealed door...

ASSA ABLOY has unveiled its new DC850 and DC870 concealed cam-motion door closers,...

Read More >>

Specification news
TORMAX IP65 & IP68 - automatic door drives for any...

Setting a new standard for hygiene, reliability, and durability, TORMAX introduces a...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

ACO Blue Roof Guide – Vol 2 Brochure

ACO Blue Roof Guide...
By ACO Building Drainag...

Download Now >>

Stannah Commercial Brochure Brochure

Stannah Commercial B...
By Stannah Group

Download Now >>

Stannah Midilift CLS Brochure

Stannah Midilift CLS
By Stannah Group

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

AlarmCalm
AlarmCalm

OverviewAlarmCalm is a powerful, flexible false fire alarm management solution that’s simple to...

Read More >>

QuickZone
QuickZone

OverviewQuickZone is our fuss-free conventional fire panel range.Quick to fit, configure and...

Read More >>

ExGo
ExGo

OverviewExGo provides a simple, dependable solution to complex fire protection problems in high-risk...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

The UK's No 1 Pool, Spa and Wellness Show – SPATEX 30 secs
The UK's No 1 Pool, Spa and Wellness Show – SPATEX 30 secs

And there’s a chance to do it all over again when the BIG 30th anniversary edition of SPATEX 2026...

Watch Now >>

Reclaimed Brick Company Leah's Yard Square Sheffield
Reclaimed Brick Company Leah's Yard Square Sheffield

Reclaimed Brick Company is part of Leah's Yard Square in Sheffield, a historic site revitalised for...

Watch Now >>

Day in the life of a Reclamation Yard
Day in the life of a Reclamation Yard

A typical day at a reclamation yard is filled with activity and discovery. Early mornings often...

Watch Now >>